Chua, D., LIJUN, S., & ENGINEERING, C. (2014). Key constraints analysis with integrated production scheduler.
Chicago Style CitationChua, D.K.H., SHEN LIJUN, and CIVIL ENGINEERING. Key Constraints Analysis With Integrated Production Scheduler. 2014.
MLA CitationChua, D.K.H., SHEN LIJUN, and CIVIL ENGINEERING. Key Constraints Analysis With Integrated Production Scheduler. 2014.
Warning: These citations may not always be 100% accurate.