Chua, D., LIJUN, S., & ENGINEERING, C. (2014). Key constraints analysis with integrated production scheduler.
Chicago Style CitationChua, D.K.H., SHEN LIJUN, and CIVIL ENGINEERING. Key Constraints Analysis With Integrated Production Scheduler. 2014.
MLA引文Chua, D.K.H., SHEN LIJUN, and CIVIL ENGINEERING. Key Constraints Analysis With Integrated Production Scheduler. 2014.
警告:這些引文格式不一定是100%准確.