Jia, H., Fuh, J., Nee, A., Zhang, Y., & ENGINEERING, M. (2014). Integration of genetic algorithm and Gantt chart for job shop scheduling in distributed manufacturing systems.
Chicago Style CitationJia, H.Z., J.Y.H Fuh, A.Y.C Nee, Y.F Zhang, and MECHANICAL ENGINEERING. Integration of Genetic Algorithm and Gantt Chart for Job Shop Scheduling in Distributed Manufacturing Systems. 2014.
MLA CitationJia, H.Z., et al. Integration of Genetic Algorithm and Gantt Chart for Job Shop Scheduling in Distributed Manufacturing Systems. 2014.
Warning: These citations may not always be 100% accurate.