APA Citation

Li, Y., Xie, M., Goh, T., & ENGINEERING, I. &. S. (2014). A study of analogy based sampling for interval based cost estimation for software project management.

Chicago Style Citation

Li, Y.F., M. Xie, T.N Goh, and INDUSTRIAL & SYSTEMS ENGINEERING. A Study of Analogy Based Sampling for Interval Based Cost Estimation for Software Project Management. 2014.

MLA Citation

Li, Y.F., M. Xie, T.N Goh, and INDUSTRIAL & SYSTEMS ENGINEERING. A Study of Analogy Based Sampling for Interval Based Cost Estimation for Software Project Management. 2014.

Warning: These citations may not always be 100% accurate.