An investigation of critical chain and lean project scheduling
Proceedings of IGLC16: 16th Annual Conference of the International Group for Lean Construction
Saved in:
Main Authors: | Shen, L., Chua, D.K.H. |
---|---|
Other Authors: | CIVIL ENGINEERING |
Format: | Conference or Workshop Item |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/74057 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Key constraint analysis: Achieve lean processes with the application of TOC
by: SHEN LIJUN, et al.
Published: (2014) -
Key constraints analysis with integrated production scheduler
by: Chua, D.K.H., et al.
Published: (2014) -
Impact of variability on construction schedules
by: SHEN LIJUN, et al.
Published: (2014) -
Managing lean projects: Understanding the structures of lean production
by: Tan, W.
Published: (2013) -
The Toyota Way model: An alternative framework for lean construction
by: Gao, S., et al.
Published: (2014)