Oh, H., Karimi, I., & ENGINEERING, C. &. E. (2014). Planning production on a single processor with sequence-dependent setups. Part 2: Campaign sequencing and scheduling.
استشهاد بنمط شيكاغوOh, H.-C., I.A Karimi, و CHEMICAL & ENVIRONMENTAL ENGINEERING. Planning Production On a Single Processor With Sequence-dependent Setups. Part 2: Campaign Sequencing and Scheduling. 2014.
MLA استشهادOh, H.-C., I.A Karimi, و CHEMICAL & ENVIRONMENTAL ENGINEERING. Planning Production On a Single Processor With Sequence-dependent Setups. Part 2: Campaign Sequencing and Scheduling. 2014.
تحذير: قد لا تكون هذه الاستشهادات دائما دقيقة بنسبة 100%.