Oh, H., Karimi, I., & ENGINEERING, C. &. E. (2014). Planning production on a single processor with sequence-dependent setups. Part 2: Campaign sequencing and scheduling.
Chicago Style CitationOh, H.-C., I.A Karimi, and CHEMICAL & ENVIRONMENTAL ENGINEERING. Planning Production On a Single Processor With Sequence-dependent Setups. Part 2: Campaign Sequencing and Scheduling. 2014.
MLA引文Oh, H.-C., I.A Karimi, and CHEMICAL & ENVIRONMENTAL ENGINEERING. Planning Production On a Single Processor With Sequence-dependent Setups. Part 2: Campaign Sequencing and Scheduling. 2014.
警告:這些引文格式不一定是100%准確.