DEMEESTER, L., & TANG, C. S. (1996). Reducing Cycle Time at an IBM Wafer Fabrication Facility. Institutional Knowledge at Singapore Management University.
Chicago Style CitationDEMEESTER, Lieven, and Christopher S. TANG. Reducing Cycle Time At an IBM Wafer Fabrication Facility. Institutional Knowledge at Singapore Management University, 1996.
MLA引文DEMEESTER, Lieven, and Christopher S. TANG. Reducing Cycle Time At an IBM Wafer Fabrication Facility. Institutional Knowledge at Singapore Management University, 1996.
警告:這些引文格式不一定是100%准確.