Replanning the Master Production Schedule for a Capacity Constrained Job Shop
An examination of the use of both frozen and replanning intervals for planning the master production schedule for a capacity-constrained job shop is presented. The results show that forecast error, demand lumpiness, setup time, planned lead time, and order size have a greater impact on the mean tota...
Saved in:
Main Authors: | , |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
1999
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/2217 https://proquest.umi.com/pqdlink?did=49620554&sid=8&Fmt=4&clientId=44274&RQT=309&VName=PQD |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
id |
sg-smu-ink.lkcsb_research-3216 |
---|---|
record_format |
dspace |
spelling |
sg-smu-ink.lkcsb_research-32162010-09-23T12:30:04Z Replanning the Master Production Schedule for a Capacity Constrained Job Shop Yang, Kum Khiong Jacobs, F.R. An examination of the use of both frozen and replanning intervals for planning the master production schedule for a capacity-constrained job shop is presented. The results show that forecast error, demand lumpiness, setup time, planned lead time, and order size have a greater impact on the mean total backlog, total inventory, and number of setups than the frozen and replanning intervals. 1999-01-01T08:00:00Z text https://ink.library.smu.edu.sg/lkcsb_research/2217 info:doi/10.1111/j.1540-5915.1999.tb00904.x https://proquest.umi.com/pqdlink?did=49620554&sid=8&Fmt=4&clientId=44274&RQT=309&VName=PQD Research Collection Lee Kong Chian School Of Business eng Institutional Knowledge at Singapore Management University Business |
institution |
Singapore Management University |
building |
SMU Libraries |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
SMU Libraries |
collection |
InK@SMU |
language |
English |
topic |
Business |
spellingShingle |
Business Yang, Kum Khiong Jacobs, F.R. Replanning the Master Production Schedule for a Capacity Constrained Job Shop |
description |
An examination of the use of both frozen and replanning intervals for planning the master production schedule for a capacity-constrained job shop is presented. The results show that forecast error, demand lumpiness, setup time, planned lead time, and order size have a greater impact on the mean total backlog, total inventory, and number of setups than the frozen and replanning intervals. |
format |
text |
author |
Yang, Kum Khiong Jacobs, F.R. |
author_facet |
Yang, Kum Khiong Jacobs, F.R. |
author_sort |
Yang, Kum Khiong |
title |
Replanning the Master Production Schedule for a Capacity Constrained Job Shop |
title_short |
Replanning the Master Production Schedule for a Capacity Constrained Job Shop |
title_full |
Replanning the Master Production Schedule for a Capacity Constrained Job Shop |
title_fullStr |
Replanning the Master Production Schedule for a Capacity Constrained Job Shop |
title_full_unstemmed |
Replanning the Master Production Schedule for a Capacity Constrained Job Shop |
title_sort |
replanning the master production schedule for a capacity constrained job shop |
publisher |
Institutional Knowledge at Singapore Management University |
publishDate |
1999 |
url |
https://ink.library.smu.edu.sg/lkcsb_research/2217 https://proquest.umi.com/pqdlink?did=49620554&sid=8&Fmt=4&clientId=44274&RQT=309&VName=PQD |
_version_ |
1770570178932768768 |