New computational results on the discrete time/cost trade-off problem in project networks
We describe a new exact procedure for the discrete time/cost trade-off problem in deterministic activity-on-the-arc networks of the CPM type, where the duration of each activity is a discrete, nonincreasing function of the amount of a single resource (money) committed to it. The objective is to cons...
محفوظ في:
المؤلفون الرئيسيون: | DEMEULEMEESTER, Erik, DE REYCK, Bert, FOUBERT, Bram, HERROELEN, Willy |
---|---|
التنسيق: | text |
اللغة: | English |
منشور في: |
Institutional Knowledge at Singapore Management University
1998
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://ink.library.smu.edu.sg/lkcsb_research/6739 https://ink.library.smu.edu.sg/context/lkcsb_research/article/7766/viewcontent/New_computational_results_on_the_discrete_time_cost_trade_off_problem_in_project_networks.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
المؤسسة: | Singapore Management University |
اللغة: | English |
مواد مشابهة
-
Local search methods for the discrete time/resource trade-off problem in project networks
بواسطة: DE REYCK, Bert, وآخرون
منشور في: (1998) -
The discrete time/resource trade-off problem in project networks: A branch-and-bound approach
بواسطة: DEMEULEMEESTER, Erik, وآخرون
منشور في: (2000) -
Resource-constrained project scheduling: A survey of recent developments
بواسطة: HERROELEN, Willy, وآخرون
منشور في: (1998) -
A classification scheme for project scheduling problems
بواسطة: HERROELEN, Willy, وآخرون
منشور في: (1999) -
An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
بواسطة: DE REYCK, Bert, وآخرون
منشور في: (1998)