Managing risks in information technology projects

The development and implementation of IT (Information Technology) projects are plagued with problems of cost and time overruns. technical inadequacy, inability to meet user requirements. lack of utilization. and failure to achieve anticipated benefits. These problems occur to some projects and not to...

全面介紹

Saved in:
書目詳細資料
Main Authors: NEO, Boon Siong, LEONG, Kwong Sin
格式: text
語言:English
出版: Institutional Knowledge at Singapore Management University 1994
主題:
在線閱讀:https://ink.library.smu.edu.sg/soa_research/1569
https://ink.library.smu.edu.sg/context/soa_research/article/2596/viewcontent/JITM_Vol_V_No.3_4__1_.pdf
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
實物特徵
總結:The development and implementation of IT (Information Technology) projects are plagued with problems of cost and time overruns. technical inadequacy, inability to meet user requirements. lack of utilization. and failure to achieve anticipated benefits. These problems occur to some projects and not to others because I) IT projects have different profiles of risk. and 2) IT project risks have been managed more or less effectively. This paper synthesizes the literature into four classes of risks. and applies it to evaluate TradeNet. an EDLbased trading system implemented in Singapore in I989. Through a case study of TradeNet. we derived a typology of four risk management strategies for IT projects: I) risk preemption. 2) risk reduction. 3) risk isolation. and 4) risk sharing. Each risk management strategy is described in terms of the tactics and mechanisms used in the TradeNet project. Some of these tactics include: positioning the system. providing incentives for adoption. managing project development. information and expertise. scoping the system. separating accountability. surfacing of problems. cooperating with organizations, coopting key personnel. and connecting to other systems. The relevance of these risk management strategies is analyzed and discussed.