#TITLE_ALTERNATIVE#
From the previous study in this x field, we could obtained the value of critical reservoir pressure (CRP) and critical depletion pressure (CDP), then with this study we calculate the quantity of produced sand if the value is eksceeded. In this study a new important factor necessary for the estimatio...
Saved in:
Main Author: | P. RITONGA (NIM 12203017), BONA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/10104 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: BONA NITZE (NIM 13103064), EUREKA -
#TITLE_ALTERNATIVE#
by: SANDE BONA (NIM 13204188), DANIEL -
#TITLE_ALTERNATIVE#
by: P. M. (NIM 20506019), MAURITZ -
#TITLE_ALTERNATIVE#
by: P. SIBARANI (NIM 12101012), AUGUST -
#TITLE_ALTERNATIVE#
by: P. FORTRANIAWAN (NIM 12001014), R.