#TITLE_ALTERNATIVE#
<p align="justify">Scheduling is allocating resources at shop floor level to achieve goal of production system. At shop floor level disturbance often happens which impacts the existing schedule becomes unfeasable. Disturbance could be predictable, sometimes could happen suddenly. The...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/11375 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |