COMPARISON STUDY OVERLAY TOWARD FLEXIBLE PAVEMENT USING EVERSERIES COMPUTER PROGRAMING AND BINA MARGA METHOD (RSNI 2004) (CASE : JAGORAWI TOLL ROAD ON CIBUBUR-CIMANGGIS SEGMENT)

Pavement evaluation of existing pavement was conducted in order to keep the design life of pavement and its serviceability. Pavement overlay,one method of pavement maintenance, was used in this research. Overlay thickness was calculated in Jagorawi Toll Road i.e. Cibubur-Cimanggis section (Km 14+20...

Full description

Saved in:
Bibliographic Details
Main Author: KOMALA SARI, TINTAN
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/11520
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:11520
spelling id-itb.:115202017-09-27T15:23:36ZCOMPARISON STUDY OVERLAY TOWARD FLEXIBLE PAVEMENT USING EVERSERIES COMPUTER PROGRAMING AND BINA MARGA METHOD (RSNI 2004) (CASE : JAGORAWI TOLL ROAD ON CIBUBUR-CIMANGGIS SEGMENT) KOMALA SARI, TINTAN Teknik sipil Indonesia Theses Deflection, Overlay, EVERSERIES Program INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/11520 Pavement evaluation of existing pavement was conducted in order to keep the design life of pavement and its serviceability. Pavement overlay,one method of pavement maintenance, was used in this research. Overlay thickness was calculated in Jagorawi Toll Road i.e. Cibubur-Cimanggis section (Km 14+200 to Km 19+000). The data needed were deflection, existing pavement structure, traffic volume and pavement temperature. The deflection data was obtained by using the FWD equipment. The cumulative ESAL used for Bina Marga method (RSNI 2004) and EVERSERIES program was 126.612.993 ESAL for lane A and 121.480.005 ESAL for lane B. Due to the overlay thickness resulted from EVERSERIES was very fluctuated, the segmentation was needed to divide the total length of research study into several sections and to achieve the effective overlay design.<p>Based on the Bina Marga method (RSNI 2004), the overlay thickness for lane A are: 7 cm on segment I, 4 cm on segment II and 5 cm on segment III. While for lane B, the overlay thickness are 4 cm on segment I, 4 cm on segment II and 4 cm on segment III. The overlay thickness calculated on each segment was depend on the FWD deflection i.e. the higher the deflection the thicker the overlay thickness. On the other hand, the result of the EVERPAVE program showed that the overlay thickness for lane A are 31 cm, 23 cm and 30 cm, respectively. While for lane B, the overlay thickness are 25 cm, 23 cm and 24 cm, respectively.<p>The general conclusion of direction A and B, showed that the special investigation was needed in some sections, for example Km 14+200 on direction A and Km 15 +500 on direction B, this is due to the calculated overlay thickness was very high. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik sipil
spellingShingle Teknik sipil
KOMALA SARI, TINTAN
COMPARISON STUDY OVERLAY TOWARD FLEXIBLE PAVEMENT USING EVERSERIES COMPUTER PROGRAMING AND BINA MARGA METHOD (RSNI 2004) (CASE : JAGORAWI TOLL ROAD ON CIBUBUR-CIMANGGIS SEGMENT)
description Pavement evaluation of existing pavement was conducted in order to keep the design life of pavement and its serviceability. Pavement overlay,one method of pavement maintenance, was used in this research. Overlay thickness was calculated in Jagorawi Toll Road i.e. Cibubur-Cimanggis section (Km 14+200 to Km 19+000). The data needed were deflection, existing pavement structure, traffic volume and pavement temperature. The deflection data was obtained by using the FWD equipment. The cumulative ESAL used for Bina Marga method (RSNI 2004) and EVERSERIES program was 126.612.993 ESAL for lane A and 121.480.005 ESAL for lane B. Due to the overlay thickness resulted from EVERSERIES was very fluctuated, the segmentation was needed to divide the total length of research study into several sections and to achieve the effective overlay design.<p>Based on the Bina Marga method (RSNI 2004), the overlay thickness for lane A are: 7 cm on segment I, 4 cm on segment II and 5 cm on segment III. While for lane B, the overlay thickness are 4 cm on segment I, 4 cm on segment II and 4 cm on segment III. The overlay thickness calculated on each segment was depend on the FWD deflection i.e. the higher the deflection the thicker the overlay thickness. On the other hand, the result of the EVERPAVE program showed that the overlay thickness for lane A are 31 cm, 23 cm and 30 cm, respectively. While for lane B, the overlay thickness are 25 cm, 23 cm and 24 cm, respectively.<p>The general conclusion of direction A and B, showed that the special investigation was needed in some sections, for example Km 14+200 on direction A and Km 15 +500 on direction B, this is due to the calculated overlay thickness was very high.
format Theses
author KOMALA SARI, TINTAN
author_facet KOMALA SARI, TINTAN
author_sort KOMALA SARI, TINTAN
title COMPARISON STUDY OVERLAY TOWARD FLEXIBLE PAVEMENT USING EVERSERIES COMPUTER PROGRAMING AND BINA MARGA METHOD (RSNI 2004) (CASE : JAGORAWI TOLL ROAD ON CIBUBUR-CIMANGGIS SEGMENT)
title_short COMPARISON STUDY OVERLAY TOWARD FLEXIBLE PAVEMENT USING EVERSERIES COMPUTER PROGRAMING AND BINA MARGA METHOD (RSNI 2004) (CASE : JAGORAWI TOLL ROAD ON CIBUBUR-CIMANGGIS SEGMENT)
title_full COMPARISON STUDY OVERLAY TOWARD FLEXIBLE PAVEMENT USING EVERSERIES COMPUTER PROGRAMING AND BINA MARGA METHOD (RSNI 2004) (CASE : JAGORAWI TOLL ROAD ON CIBUBUR-CIMANGGIS SEGMENT)
title_fullStr COMPARISON STUDY OVERLAY TOWARD FLEXIBLE PAVEMENT USING EVERSERIES COMPUTER PROGRAMING AND BINA MARGA METHOD (RSNI 2004) (CASE : JAGORAWI TOLL ROAD ON CIBUBUR-CIMANGGIS SEGMENT)
title_full_unstemmed COMPARISON STUDY OVERLAY TOWARD FLEXIBLE PAVEMENT USING EVERSERIES COMPUTER PROGRAMING AND BINA MARGA METHOD (RSNI 2004) (CASE : JAGORAWI TOLL ROAD ON CIBUBUR-CIMANGGIS SEGMENT)
title_sort comparison study overlay toward flexible pavement using everseries computer programing and bina marga method (rsni 2004) (case : jagorawi toll road on cibubur-cimanggis segment)
url https://digilib.itb.ac.id/gdl/view/11520
_version_ 1820728230164824064