#TITLE_ALTERNATIVE#
nloading process of the gas lift is a transient process in which the amount of gas is injected into the well. Then the gas pass through the surface choke to lift killing fluid coming out from the well. This thesis discusses about the elapsed time problem in the unloading process of gas lift. The pro...
Saved in:
Main Author: | DANI FAUZI (NIM 10104023), UMAR |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/11543 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: AMINUDIN ( NIM 10205053) pembimbing : Prof. Dr. rer. nat Umar Fauzi, ODING -
#TITLE_ALTERNATIVE#
by: NAJMUDIN (NIM 10103056), DANI -
#TITLE_ALTERNATIVE#
by: NUGROHO (NIM : 29105304), DANI -
#TITLE_ALTERNATIVE#
by: SURYA BUANA (NIM 102 02 053); pembimbing : Dr. rer. nat. Umar Fauzi, HUDA -
#TITLE_ALTERNATIVE#
by: JAYA KESUMA (NIM 23206309), DANI