Knowledge Management Initial Model: Case Study on Sub Directorate Signalling, Telecommunication & Electric Overhead Line of Indonesian Railway
Knowledge management implementation is purposed to easily and catalyzes knowledge sharing process (tools or methods), to enhance knowledge assets in the organization, so that can be utilize to fully help in daily job. A model is needed in the implementatioin of knowledge management as a guideline to...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/11941 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:11941 |
---|---|
spelling |
id-itb.:119412017-09-27T15:37:38ZKnowledge Management Initial Model: Case Study on Sub Directorate Signalling, Telecommunication & Electric Overhead Line of Indonesian Railway HIDAYAT (NIM 23207043), CHOMSA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/11941 Knowledge management implementation is purposed to easily and catalyzes knowledge sharing process (tools or methods), to enhance knowledge assets in the organization, so that can be utilize to fully help in daily job. A model is needed in the implementatioin of knowledge management as a guideline to give clear direction or objective of knowledge management initiatives. The model consists of critical enablers who are determining successness or failure of knowledge mangement implementation. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Knowledge management implementation is purposed to easily and catalyzes knowledge sharing process (tools or methods), to enhance knowledge assets in the organization, so that can be utilize to fully help in daily job. A model is needed in the implementatioin of knowledge management as a guideline to give clear direction or objective of knowledge management initiatives. The model consists of critical enablers who are determining successness or failure of knowledge mangement implementation. |
format |
Theses |
author |
HIDAYAT (NIM 23207043), CHOMSA |
spellingShingle |
HIDAYAT (NIM 23207043), CHOMSA Knowledge Management Initial Model: Case Study on Sub Directorate Signalling, Telecommunication & Electric Overhead Line of Indonesian Railway |
author_facet |
HIDAYAT (NIM 23207043), CHOMSA |
author_sort |
HIDAYAT (NIM 23207043), CHOMSA |
title |
Knowledge Management Initial Model: Case Study on Sub Directorate Signalling, Telecommunication & Electric Overhead Line of Indonesian Railway |
title_short |
Knowledge Management Initial Model: Case Study on Sub Directorate Signalling, Telecommunication & Electric Overhead Line of Indonesian Railway |
title_full |
Knowledge Management Initial Model: Case Study on Sub Directorate Signalling, Telecommunication & Electric Overhead Line of Indonesian Railway |
title_fullStr |
Knowledge Management Initial Model: Case Study on Sub Directorate Signalling, Telecommunication & Electric Overhead Line of Indonesian Railway |
title_full_unstemmed |
Knowledge Management Initial Model: Case Study on Sub Directorate Signalling, Telecommunication & Electric Overhead Line of Indonesian Railway |
title_sort |
knowledge management initial model: case study on sub directorate signalling, telecommunication & electric overhead line of indonesian railway |
url |
https://digilib.itb.ac.id/gdl/view/11941 |
_version_ |
1820728361869115392 |