OPERATING STRATEGY UTILIZING BALL MILL CAPACITY TO MAXIMIZE PROFITABILITY CONCENTRATING PLANT PT XYZ

Concentrating Division of PT XYZ has four concentrators used for processing ore into concentrate. There are North and South ball mills, SAG#1, and SAG#2. North and South ball mills get their feed from crushing plant. Since its expansion completed in the mid year of 2008, crushing plant capacity incr...

Full description

Saved in:
Bibliographic Details
Main Author: PURNOMO (NIM : 29107149), EKO
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/12050
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:12050
spelling id-itb.:120502017-09-27T15:30:46ZOPERATING STRATEGY UTILIZING BALL MILL CAPACITY TO MAXIMIZE PROFITABILITY CONCENTRATING PLANT PT XYZ PURNOMO (NIM : 29107149), EKO Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12050 Concentrating Division of PT XYZ has four concentrators used for processing ore into concentrate. There are North and South ball mills, SAG#1, and SAG#2. North and South ball mills get their feed from crushing plant. Since its expansion completed in the mid year of 2008, crushing plant capacity increase from 70,000 to 80,000 ton per day. The increasing capacity is beyond downstream capacity so there's an idle capacity in crushing plant.<p>By renewing current operation strategy, with reviewing ball mill utilization in all concentrators, there is an opportunity that can be used to maximize operational plant profit.<p>From thorough research based on production data, literacy study, and characteristic performance of each concentrating plants at North South mill, SAG#1, and SAG#2, the alternatives of operation strategy that can be implemented are continue the current strategy, by increasing throughput at North South ball mills synchronized with crushing plant throughput and by distributing more throughput from crushing plant to ball mills at other concentrator.<p>The first alternative have no additional profitability, meanwhile the second alternative has a potential to increase operating profit of concentrating plant by 2.1 %, but it have operational risk and policy constraints because recovery will be reduced. The Third alternative has a potential to increase operating profit of concentrating plant by 3.5 % without any operational risk and policy constraints.<p>From this study, it is recommeded to increase crushing plant throughput then distribut it to C4 ball mill. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Concentrating Division of PT XYZ has four concentrators used for processing ore into concentrate. There are North and South ball mills, SAG#1, and SAG#2. North and South ball mills get their feed from crushing plant. Since its expansion completed in the mid year of 2008, crushing plant capacity increase from 70,000 to 80,000 ton per day. The increasing capacity is beyond downstream capacity so there's an idle capacity in crushing plant.<p>By renewing current operation strategy, with reviewing ball mill utilization in all concentrators, there is an opportunity that can be used to maximize operational plant profit.<p>From thorough research based on production data, literacy study, and characteristic performance of each concentrating plants at North South mill, SAG#1, and SAG#2, the alternatives of operation strategy that can be implemented are continue the current strategy, by increasing throughput at North South ball mills synchronized with crushing plant throughput and by distributing more throughput from crushing plant to ball mills at other concentrator.<p>The first alternative have no additional profitability, meanwhile the second alternative has a potential to increase operating profit of concentrating plant by 2.1 %, but it have operational risk and policy constraints because recovery will be reduced. The Third alternative has a potential to increase operating profit of concentrating plant by 3.5 % without any operational risk and policy constraints.<p>From this study, it is recommeded to increase crushing plant throughput then distribut it to C4 ball mill.
format Theses
author PURNOMO (NIM : 29107149), EKO
spellingShingle PURNOMO (NIM : 29107149), EKO
OPERATING STRATEGY UTILIZING BALL MILL CAPACITY TO MAXIMIZE PROFITABILITY CONCENTRATING PLANT PT XYZ
author_facet PURNOMO (NIM : 29107149), EKO
author_sort PURNOMO (NIM : 29107149), EKO
title OPERATING STRATEGY UTILIZING BALL MILL CAPACITY TO MAXIMIZE PROFITABILITY CONCENTRATING PLANT PT XYZ
title_short OPERATING STRATEGY UTILIZING BALL MILL CAPACITY TO MAXIMIZE PROFITABILITY CONCENTRATING PLANT PT XYZ
title_full OPERATING STRATEGY UTILIZING BALL MILL CAPACITY TO MAXIMIZE PROFITABILITY CONCENTRATING PLANT PT XYZ
title_fullStr OPERATING STRATEGY UTILIZING BALL MILL CAPACITY TO MAXIMIZE PROFITABILITY CONCENTRATING PLANT PT XYZ
title_full_unstemmed OPERATING STRATEGY UTILIZING BALL MILL CAPACITY TO MAXIMIZE PROFITABILITY CONCENTRATING PLANT PT XYZ
title_sort operating strategy utilizing ball mill capacity to maximize profitability concentrating plant pt xyz
url https://digilib.itb.ac.id/gdl/view/12050
_version_ 1820728397716783104