PT. SRT is a subsidiary of PT. PLN (Persero) operating in the power generating business particularly in Bali island region. PT. SRT with total installed capacity 432.67 MW consist of Pesanggaran Diesel Power Plant (DPP) (75.82 MW), Pesanggaran Gas Turbine Power Plant (GTPP) (125.45 MW), Gilimanuk GT...

Full description

Saved in:
Bibliographic Details
Main Author: INDRAMAULANA (NIM: 29107175) , GINANJAR
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/12154
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:12154
spelling id-itb.:121542017-09-27T15:30:46ZECONOMIC ANALYSIS OF HSD CONVERSION TO MFO AS DIESEL POWER PLANT FUEL: CASE STUDY OF PESANGGARAN DIESEL POWER PLANT OF INDONESIA POWER BALI GENERATION BUSINESS UNIT INDRAMAULANA (NIM: 29107175) , GINANJAR Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12154 PT. SRT is a subsidiary of PT. PLN (Persero) operating in the power generating business particularly in Bali island region. PT. SRT with total installed capacity 432.67 MW consist of Pesanggaran Diesel Power Plant (DPP) (75.82 MW), Pesanggaran Gas Turbine Power Plant (GTPP) (125.45 MW), Gilimanuk GTPP (133.8 MW) and Pemaron GTPP (97.6 MW). Currently PT. SRT in securing electricity supply mainly in Bali island as a world tourism destination face some important business issues such as all power plants are oil utilization power plant, high growth demand, primary energy sources problem which are natural gas supply availability problem and rising of oil price, tariff regulation. Following the hike of oil price, that high growth electricity demand has to fulfill by high generating cost of oil based power plant. The root of problem cause such business issues is the high oil price (high speed diesel/HSD), considering fuel cost is a key component in electricity generating cost of diesel power plant.<p>Possible alternative solutions for PT. SRT to supply sufficient and reliable electricity by reducing generating cost effort are through fuel conversion program and efficiency drive program at Pesanggaran DPP and other generation units (gas-based power plants), demand side management in customer side and government contribution in domestic market obligation (DMO) of natural gas for PLN's and subsidiaries power plant using from HSD to marine fuel oil (MFO) or so called MFOnisation is the main solution to cope with these business issues due to MFO price has Rp 939.40/liter cheaper than HSD price and availability of MFO to supply Bali region rather than gasification of PT. SRT's power plant.<p>This final assignment is focused on the MFOnisation at Pesanggaran DPP as a case study of MFOnisation at PT. SRT due to Pesanggaran DPP is oilbased power plant while other generation units are gas-based power plant which forces to utilize oil. MFOnisation technically can be done by additional of MFO fuel system facility, MFO treatment module and MFO heater system. Function of equipment addition is making MFO fuel specification almost equal to HSD fuel specification when that fuel (MFO) pumped to diesel engine. This MFOnisation project is required an investment to modify and install MFO system to existing HSD system. Therefore, economic analysis has to conduct on this MFOnisation project. The results presented that investment is economically viable. At the base case, the project yields Internal Rate of Return 34.62 per cent and net present value Rp 39.90 billion at discount rate 15 per cent with 33.2 per cent power plant capacity factor and can achieve net fuel saving/kWh Rp 286.70/kWh. Base on sensitivity analysis, significant factor affecting to the viability such as fuel price difference between HSD and MFO (in this case is fuel saving/kWh because SFC between HSD and MFO are slightly different) and projection of electricity production needs to consider when MFOnisation power plant investment want to conduct. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT. SRT is a subsidiary of PT. PLN (Persero) operating in the power generating business particularly in Bali island region. PT. SRT with total installed capacity 432.67 MW consist of Pesanggaran Diesel Power Plant (DPP) (75.82 MW), Pesanggaran Gas Turbine Power Plant (GTPP) (125.45 MW), Gilimanuk GTPP (133.8 MW) and Pemaron GTPP (97.6 MW). Currently PT. SRT in securing electricity supply mainly in Bali island as a world tourism destination face some important business issues such as all power plants are oil utilization power plant, high growth demand, primary energy sources problem which are natural gas supply availability problem and rising of oil price, tariff regulation. Following the hike of oil price, that high growth electricity demand has to fulfill by high generating cost of oil based power plant. The root of problem cause such business issues is the high oil price (high speed diesel/HSD), considering fuel cost is a key component in electricity generating cost of diesel power plant.<p>Possible alternative solutions for PT. SRT to supply sufficient and reliable electricity by reducing generating cost effort are through fuel conversion program and efficiency drive program at Pesanggaran DPP and other generation units (gas-based power plants), demand side management in customer side and government contribution in domestic market obligation (DMO) of natural gas for PLN's and subsidiaries power plant using from HSD to marine fuel oil (MFO) or so called MFOnisation is the main solution to cope with these business issues due to MFO price has Rp 939.40/liter cheaper than HSD price and availability of MFO to supply Bali region rather than gasification of PT. SRT's power plant.<p>This final assignment is focused on the MFOnisation at Pesanggaran DPP as a case study of MFOnisation at PT. SRT due to Pesanggaran DPP is oilbased power plant while other generation units are gas-based power plant which forces to utilize oil. MFOnisation technically can be done by additional of MFO fuel system facility, MFO treatment module and MFO heater system. Function of equipment addition is making MFO fuel specification almost equal to HSD fuel specification when that fuel (MFO) pumped to diesel engine. This MFOnisation project is required an investment to modify and install MFO system to existing HSD system. Therefore, economic analysis has to conduct on this MFOnisation project. The results presented that investment is economically viable. At the base case, the project yields Internal Rate of Return 34.62 per cent and net present value Rp 39.90 billion at discount rate 15 per cent with 33.2 per cent power plant capacity factor and can achieve net fuel saving/kWh Rp 286.70/kWh. Base on sensitivity analysis, significant factor affecting to the viability such as fuel price difference between HSD and MFO (in this case is fuel saving/kWh because SFC between HSD and MFO are slightly different) and projection of electricity production needs to consider when MFOnisation power plant investment want to conduct. <br />
format Theses
author INDRAMAULANA (NIM: 29107175) , GINANJAR
spellingShingle INDRAMAULANA (NIM: 29107175) , GINANJAR
ECONOMIC ANALYSIS OF HSD CONVERSION TO MFO AS DIESEL POWER PLANT FUEL: CASE STUDY OF PESANGGARAN DIESEL POWER PLANT OF INDONESIA POWER BALI GENERATION BUSINESS UNIT
author_facet INDRAMAULANA (NIM: 29107175) , GINANJAR
author_sort INDRAMAULANA (NIM: 29107175) , GINANJAR
title ECONOMIC ANALYSIS OF HSD CONVERSION TO MFO AS DIESEL POWER PLANT FUEL: CASE STUDY OF PESANGGARAN DIESEL POWER PLANT OF INDONESIA POWER BALI GENERATION BUSINESS UNIT
title_short ECONOMIC ANALYSIS OF HSD CONVERSION TO MFO AS DIESEL POWER PLANT FUEL: CASE STUDY OF PESANGGARAN DIESEL POWER PLANT OF INDONESIA POWER BALI GENERATION BUSINESS UNIT
title_full ECONOMIC ANALYSIS OF HSD CONVERSION TO MFO AS DIESEL POWER PLANT FUEL: CASE STUDY OF PESANGGARAN DIESEL POWER PLANT OF INDONESIA POWER BALI GENERATION BUSINESS UNIT
title_fullStr ECONOMIC ANALYSIS OF HSD CONVERSION TO MFO AS DIESEL POWER PLANT FUEL: CASE STUDY OF PESANGGARAN DIESEL POWER PLANT OF INDONESIA POWER BALI GENERATION BUSINESS UNIT
title_full_unstemmed ECONOMIC ANALYSIS OF HSD CONVERSION TO MFO AS DIESEL POWER PLANT FUEL: CASE STUDY OF PESANGGARAN DIESEL POWER PLANT OF INDONESIA POWER BALI GENERATION BUSINESS UNIT
title_sort economic analysis of hsd conversion to mfo as diesel power plant fuel: case study of pesanggaran diesel power plant of indonesia power bali generation business unit
url https://digilib.itb.ac.id/gdl/view/12154
_version_ 1820728430934622208