PROJECT FINANCING STRATEGY TROUGH OPTIMIZING THE CLEAN DEVELOPMENT MECHANISME (CDM) CONTRIBUTION (Case Study: PLTG METHANE JAMBI)
PT. S is a joint venture company which is formed by PT.M and PT. N. PT. S field of expertise is in constracting power plant. The project that the company will do is constructing 2 MW power plant using Palm Oil Mills Effluent (POME). This POME will produce biogass and boiomass that can generate elec...
Saved in:
Main Author: | SETIAWAN SYAFRUDIN (NIM: 29106063) , IVAN |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/12275 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ESTIMATED AND ACTUAL EMISSION REDUCTIONS IN CLEAN DEVELOPMENT MECHANISM (CDM) PROJECTS IN VIETNAM
by: VU THI BICH
Published: (2014) -
Transaction cost reduction for small-scale Clean Development Mechanism (CDM) Projects in Thailand
by: Salmela, Sanna
Published: (2011) -
Does it deliver? an analysis of the sustainable development benefits from clean development mechanism (CDM) projects in Thailand
by: Swickard, Naomi J.
Published: (2012) -
The effectiveness of clean development mechanism (CDM) in supporting poverty alleviation in South Africa
by: , AMALIA, Nailul Lutfi, et al.
Published: (2009) -
The role of designated national authority in driving clean development mechanism (CDM) in Thailand
by: Napas Charnyapornpong
Published: (2012)