Any electric power supply system must be able to serve all requirements on demand at all times. The difference between the amount of base load and peak load period causes the generation of running the operation uneconomical. Therefore, pumped storage power plant technology is possible to apply. Pump...

Full description

Saved in:
Bibliographic Details
Main Author: HADI MAHMUDI (NIM 13205115), M.
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/12378
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:12378
spelling id-itb.:123782017-09-27T10:18:47Z#TITLE_ALTERNATIVE# HADI MAHMUDI (NIM 13205115), M. Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12378 Any electric power supply system must be able to serve all requirements on demand at all times. The difference between the amount of base load and peak load period causes the generation of running the operation uneconomical. Therefore, pumped storage power plant technology is possible to apply. Pumped storage power plant can store energy at base load period to be reused during peak load period. In this final project, presented an approach method for calculating the optimal installed capacity of pumped storage power plant. This method allows one to calculate the optimal installed capacity of pumped storage power plant for each curve using the system load curve duration with graphical approach in modeling the load curve. In this final project, the method is applied to the daily load curve of Jawa-Bali and it regions. For the load curve of Jawa-Bali obtained the optimal value of pumped storage power plant capacity of 2,250 MW with a base load capacity of 14,404 MW. In a further analysis, described about pumped storage power plant application to the load curve and calculation of it margin based on the electricity basic tariff of PLN. From the calculation, applied pumped storage power plant can make the total margin will reach amount 1.028 billion per day. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Any electric power supply system must be able to serve all requirements on demand at all times. The difference between the amount of base load and peak load period causes the generation of running the operation uneconomical. Therefore, pumped storage power plant technology is possible to apply. Pumped storage power plant can store energy at base load period to be reused during peak load period. In this final project, presented an approach method for calculating the optimal installed capacity of pumped storage power plant. This method allows one to calculate the optimal installed capacity of pumped storage power plant for each curve using the system load curve duration with graphical approach in modeling the load curve. In this final project, the method is applied to the daily load curve of Jawa-Bali and it regions. For the load curve of Jawa-Bali obtained the optimal value of pumped storage power plant capacity of 2,250 MW with a base load capacity of 14,404 MW. In a further analysis, described about pumped storage power plant application to the load curve and calculation of it margin based on the electricity basic tariff of PLN. From the calculation, applied pumped storage power plant can make the total margin will reach amount 1.028 billion per day.
format Final Project
author HADI MAHMUDI (NIM 13205115), M.
spellingShingle HADI MAHMUDI (NIM 13205115), M.
#TITLE_ALTERNATIVE#
author_facet HADI MAHMUDI (NIM 13205115), M.
author_sort HADI MAHMUDI (NIM 13205115), M.
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/12378
_version_ 1820728502391930880