STRATEGIC PLANNING FRAMEWORK DESIGN AND IMPLEMENTATION ANALYSIS FOR INFORMATION SYSTEM AND TECHNOLOGY IN POWER PLANT COMPANY
The basic concept used in building Information System and Information Technology strategic planning framework is methodology proposed by John Ward and Joe Peppard. The proposed framework on Information System and Information Technology strategic planning consists of 5 phase, those are: IS/IT strateg...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/12389 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:12389 |
---|---|
spelling |
id-itb.:123892017-09-27T15:37:39ZSTRATEGIC PLANNING FRAMEWORK DESIGN AND IMPLEMENTATION ANALYSIS FOR INFORMATION SYSTEM AND TECHNOLOGY IN POWER PLANT COMPANY AGUSTIAN (NIM 23207327), MOCHAMMAD Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12389 The basic concept used in building Information System and Information Technology strategic planning framework is methodology proposed by John Ward and Joe Peppard. The proposed framework on Information System and Information Technology strategic planning consists of 5 phase, those are: IS/IT strategic planning preparation initialization, Understand business and information needs, Determine IS/IT target, Determine IS/IT strategy, and How to plan and implemented it. Strategic analysis in this research is performed using PEST analysis, BCG matrix analysis, Porter's 5 Force Model analysis, SWOT analysis, Value Chain analysis, CSF and KPI analysis. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The basic concept used in building Information System and Information Technology strategic planning framework is methodology proposed by John Ward and Joe Peppard. The proposed framework on Information System and Information Technology strategic planning consists of 5 phase, those are: IS/IT strategic planning preparation initialization, Understand business and information needs, Determine IS/IT target, Determine IS/IT strategy, and How to plan and implemented it. Strategic analysis in this research is performed using PEST analysis, BCG matrix analysis, Porter's 5 Force Model analysis, SWOT analysis, Value Chain analysis, CSF and KPI analysis. |
format |
Theses |
author |
AGUSTIAN (NIM 23207327), MOCHAMMAD |
spellingShingle |
AGUSTIAN (NIM 23207327), MOCHAMMAD STRATEGIC PLANNING FRAMEWORK DESIGN AND IMPLEMENTATION ANALYSIS FOR INFORMATION SYSTEM AND TECHNOLOGY IN POWER PLANT COMPANY |
author_facet |
AGUSTIAN (NIM 23207327), MOCHAMMAD |
author_sort |
AGUSTIAN (NIM 23207327), MOCHAMMAD |
title |
STRATEGIC PLANNING FRAMEWORK DESIGN AND IMPLEMENTATION ANALYSIS FOR INFORMATION SYSTEM AND TECHNOLOGY IN POWER PLANT COMPANY |
title_short |
STRATEGIC PLANNING FRAMEWORK DESIGN AND IMPLEMENTATION ANALYSIS FOR INFORMATION SYSTEM AND TECHNOLOGY IN POWER PLANT COMPANY |
title_full |
STRATEGIC PLANNING FRAMEWORK DESIGN AND IMPLEMENTATION ANALYSIS FOR INFORMATION SYSTEM AND TECHNOLOGY IN POWER PLANT COMPANY |
title_fullStr |
STRATEGIC PLANNING FRAMEWORK DESIGN AND IMPLEMENTATION ANALYSIS FOR INFORMATION SYSTEM AND TECHNOLOGY IN POWER PLANT COMPANY |
title_full_unstemmed |
STRATEGIC PLANNING FRAMEWORK DESIGN AND IMPLEMENTATION ANALYSIS FOR INFORMATION SYSTEM AND TECHNOLOGY IN POWER PLANT COMPANY |
title_sort |
strategic planning framework design and implementation analysis for information system and technology in power plant company |
url |
https://digilib.itb.ac.id/gdl/view/12389 |
_version_ |
1820728505601622016 |