A PROPOSAL FOR PROJECT MANAGEMENT OF PROJECT Y PT. X USING DIAMOND APPROACH

PT. X is an information and communication company in Indonesian. To increase their quality of service, PT X needs to be supported by a reliable information technology/ information system, so they can make an agile maneuver. To achieve their objective, Program Z had come with Project Y as a part of t...

Full description

Saved in:
Bibliographic Details
Main Author: ADHAYANTI (NIM: 29106395), RATNA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/12534
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:12534
spelling id-itb.:125342017-09-27T15:30:46ZA PROPOSAL FOR PROJECT MANAGEMENT OF PROJECT Y PT. X USING DIAMOND APPROACH ADHAYANTI (NIM: 29106395), RATNA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12534 PT. X is an information and communication company in Indonesian. To increase their quality of service, PT X needs to be supported by a reliable information technology/ information system, so they can make an agile maneuver. To achieve their objective, Program Z had come with Project Y as a part of the program.<p>Project Y replaces E system which was used to manage revenue of PT.X before. On 2007 team Project Y Office W has executed pilot project Y. Office W considers to reevaluate pilot project Y by external side. That is what was become reason on the assignment of this final project. To guarantee the success of the project, they also need an alternative project management that is suitable with the characteristics of Y project.<p>The result of evaluation shows that most of the problems came from legacy system and user requirement that need an intensive functional test. Diamond approach is an adaptive project management that focuses on managing a project based on the type of project that is mapped from the diamond. Diamond shaped from four dimensions such as novelty, technology, complexity and pace. From the result of analysis, Project Y is an internal and strategic project that is had a characteristic as breakthrough, hightech, system, and fast/competitive. It has rather big shape that is means not only had greater risk failure (R= 2.35) but also had greater opportunity. It needs at least twice design cycle and time to freeze on the mid point after feedback to guarantee user requirement. Management style that need on Project Y is formal on schedule but flexible on design process. Team members must be qualified and had good technical skill. To adopt the approach, it doesn't need to add a team member. It just need quite lower cost that related to additional activity. Manager and team member must be measured not only by triple constraints but also greater responsibility for a widely business result. Top Management needs to involve manager and team project from the beginning. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT. X is an information and communication company in Indonesian. To increase their quality of service, PT X needs to be supported by a reliable information technology/ information system, so they can make an agile maneuver. To achieve their objective, Program Z had come with Project Y as a part of the program.<p>Project Y replaces E system which was used to manage revenue of PT.X before. On 2007 team Project Y Office W has executed pilot project Y. Office W considers to reevaluate pilot project Y by external side. That is what was become reason on the assignment of this final project. To guarantee the success of the project, they also need an alternative project management that is suitable with the characteristics of Y project.<p>The result of evaluation shows that most of the problems came from legacy system and user requirement that need an intensive functional test. Diamond approach is an adaptive project management that focuses on managing a project based on the type of project that is mapped from the diamond. Diamond shaped from four dimensions such as novelty, technology, complexity and pace. From the result of analysis, Project Y is an internal and strategic project that is had a characteristic as breakthrough, hightech, system, and fast/competitive. It has rather big shape that is means not only had greater risk failure (R= 2.35) but also had greater opportunity. It needs at least twice design cycle and time to freeze on the mid point after feedback to guarantee user requirement. Management style that need on Project Y is formal on schedule but flexible on design process. Team members must be qualified and had good technical skill. To adopt the approach, it doesn't need to add a team member. It just need quite lower cost that related to additional activity. Manager and team member must be measured not only by triple constraints but also greater responsibility for a widely business result. Top Management needs to involve manager and team project from the beginning.
format Theses
author ADHAYANTI (NIM: 29106395), RATNA
spellingShingle ADHAYANTI (NIM: 29106395), RATNA
A PROPOSAL FOR PROJECT MANAGEMENT OF PROJECT Y PT. X USING DIAMOND APPROACH
author_facet ADHAYANTI (NIM: 29106395), RATNA
author_sort ADHAYANTI (NIM: 29106395), RATNA
title A PROPOSAL FOR PROJECT MANAGEMENT OF PROJECT Y PT. X USING DIAMOND APPROACH
title_short A PROPOSAL FOR PROJECT MANAGEMENT OF PROJECT Y PT. X USING DIAMOND APPROACH
title_full A PROPOSAL FOR PROJECT MANAGEMENT OF PROJECT Y PT. X USING DIAMOND APPROACH
title_fullStr A PROPOSAL FOR PROJECT MANAGEMENT OF PROJECT Y PT. X USING DIAMOND APPROACH
title_full_unstemmed A PROPOSAL FOR PROJECT MANAGEMENT OF PROJECT Y PT. X USING DIAMOND APPROACH
title_sort proposal for project management of project y pt. x using diamond approach
url https://digilib.itb.ac.id/gdl/view/12534
_version_ 1820728548741087232