Damage Cost of Paiton Coal Steam Power Plant Unit 1 and Unit 2
This final project will discuss about the basic theory and the calculation of economic valuation of the environmental damage cost as an external cost of coal steam power plant. The external cost is calculated based on the Impact Pathway Analysis (IPA) using the SimPacts software. The external cost o...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/12752 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:12752 |
---|---|
spelling |
id-itb.:127522017-09-27T15:37:39ZDamage Cost of Paiton Coal Steam Power Plant Unit 1 and Unit 2 IGNATIUS RIDO DESANDA (NIM 23207330), VODEGEL, Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12752 This final project will discuss about the basic theory and the calculation of economic valuation of the environmental damage cost as an external cost of coal steam power plant. The external cost is calculated based on the Impact Pathway Analysis (IPA) using the SimPacts software. The external cost of Paiton Coal Steam Power Plant Unit 1 and Unit 2 is estimated about 0.27 cents$/ kWh. The rising external cost causes an increase in generation cost around 6%. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
This final project will discuss about the basic theory and the calculation of economic valuation of the environmental damage cost as an external cost of coal steam power plant. The external cost is calculated based on the Impact Pathway Analysis (IPA) using the SimPacts software. The external cost of Paiton Coal Steam Power Plant Unit 1 and Unit 2 is estimated about 0.27 cents$/ kWh. The rising external cost causes an increase in generation cost around 6%. |
format |
Theses |
author |
IGNATIUS RIDO DESANDA (NIM 23207330), VODEGEL, |
spellingShingle |
IGNATIUS RIDO DESANDA (NIM 23207330), VODEGEL, Damage Cost of Paiton Coal Steam Power Plant Unit 1 and Unit 2 |
author_facet |
IGNATIUS RIDO DESANDA (NIM 23207330), VODEGEL, |
author_sort |
IGNATIUS RIDO DESANDA (NIM 23207330), VODEGEL, |
title |
Damage Cost of Paiton Coal Steam Power Plant Unit 1 and Unit 2 |
title_short |
Damage Cost of Paiton Coal Steam Power Plant Unit 1 and Unit 2 |
title_full |
Damage Cost of Paiton Coal Steam Power Plant Unit 1 and Unit 2 |
title_fullStr |
Damage Cost of Paiton Coal Steam Power Plant Unit 1 and Unit 2 |
title_full_unstemmed |
Damage Cost of Paiton Coal Steam Power Plant Unit 1 and Unit 2 |
title_sort |
damage cost of paiton coal steam power plant unit 1 and unit 2 |
url |
https://digilib.itb.ac.id/gdl/view/12752 |
_version_ |
1820728613626970112 |