LAND VOLUME ESTIMATION AND CUT AND FILL PROCESS TIME ESTIMATION THROUGH TILE BASED TERRAIN LAND MODELING

ABSTRACT:<p>Housing development is done by passing several processes, these are topographic mapping, site planning, grading plan modeling, cut and fill processing, stacking out and building houses or others. Before the process of cut and fill is done, grading plan have to be analyzed to determ...

Full description

Saved in:
Bibliographic Details
Main Author: HAYAT (NIM: 23207114), LATIFUL
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/13020
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia