IDENTIFICATION OF INVENTORY HOLDING COST STRUCTURE (Study Case: Inventory Holding of Steel Reinforcement in Construction Project)

Minimize construction supply chain cost is one of contractor's strategic way to fight. One of many way to minimize waste of construction supply chain management is by minimize construction holding inventory cost. The aim of this research is to identify the important factor that can affect the c...

Full description

Saved in:
Bibliographic Details
Main Author: UTAMI (NIM: 250 06 015); Pembimbing: Ir. Muhamad Abduh, MT., Ph.D., RITA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/13094
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:13094
spelling id-itb.:130942017-09-27T15:23:36ZIDENTIFICATION OF INVENTORY HOLDING COST STRUCTURE (Study Case: Inventory Holding of Steel Reinforcement in Construction Project) UTAMI (NIM: 250 06 015); Pembimbing: Ir. Muhamad Abduh, MT., Ph.D., RITA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/13094 Minimize construction supply chain cost is one of contractor's strategic way to fight. One of many way to minimize waste of construction supply chain management is by minimize construction holding inventory cost. The aim of this research is to identify the important factor that can affect the construction holding inventory cost. Result of this research show that there are many important factor that can affect the construction holding inventory cost, they are: cost of wage, cost of equipment, cost of materials, and cost of overhead. Many potential reduction of wage cost, they are by reducing duration time of work, reducing cost of wage for example by using experience worker and using little number of worker, with an expectation that the construction work can finish fastly and in a good quality. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Minimize construction supply chain cost is one of contractor's strategic way to fight. One of many way to minimize waste of construction supply chain management is by minimize construction holding inventory cost. The aim of this research is to identify the important factor that can affect the construction holding inventory cost. Result of this research show that there are many important factor that can affect the construction holding inventory cost, they are: cost of wage, cost of equipment, cost of materials, and cost of overhead. Many potential reduction of wage cost, they are by reducing duration time of work, reducing cost of wage for example by using experience worker and using little number of worker, with an expectation that the construction work can finish fastly and in a good quality.
format Theses
author UTAMI (NIM: 250 06 015); Pembimbing: Ir. Muhamad Abduh, MT., Ph.D., RITA
spellingShingle UTAMI (NIM: 250 06 015); Pembimbing: Ir. Muhamad Abduh, MT., Ph.D., RITA
IDENTIFICATION OF INVENTORY HOLDING COST STRUCTURE (Study Case: Inventory Holding of Steel Reinforcement in Construction Project)
author_facet UTAMI (NIM: 250 06 015); Pembimbing: Ir. Muhamad Abduh, MT., Ph.D., RITA
author_sort UTAMI (NIM: 250 06 015); Pembimbing: Ir. Muhamad Abduh, MT., Ph.D., RITA
title IDENTIFICATION OF INVENTORY HOLDING COST STRUCTURE (Study Case: Inventory Holding of Steel Reinforcement in Construction Project)
title_short IDENTIFICATION OF INVENTORY HOLDING COST STRUCTURE (Study Case: Inventory Holding of Steel Reinforcement in Construction Project)
title_full IDENTIFICATION OF INVENTORY HOLDING COST STRUCTURE (Study Case: Inventory Holding of Steel Reinforcement in Construction Project)
title_fullStr IDENTIFICATION OF INVENTORY HOLDING COST STRUCTURE (Study Case: Inventory Holding of Steel Reinforcement in Construction Project)
title_full_unstemmed IDENTIFICATION OF INVENTORY HOLDING COST STRUCTURE (Study Case: Inventory Holding of Steel Reinforcement in Construction Project)
title_sort identification of inventory holding cost structure (study case: inventory holding of steel reinforcement in construction project)
url https://digilib.itb.ac.id/gdl/view/13094
_version_ 1820736087930175488