#TITLE_ALTERNATIVE#
XA Field is a marginal field because it has a small IOIP. This field began production in July 1997 with the operation of wells XA-01 and closed in February 1998 because of large amounts of water produced beyond economics limit. Oil price increase significantly, making the management held a study to...
Saved in:
Main Author: | HERLAMBANG (NIM 12206003); Pembimbing: Dr. Ir. Taufan Marhaendrajana ,M.Sc., BASKORO |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13325 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: (NIM 12206055); Pembimbing: Dr.Ir.Taufan Marhaendrajana, ABDURACHMAN -
#TITLE_ALTERNATIVE#
by: FIRANDA (NIM 12204021); Pembimbing : Dr. Ir. Taufan Marhaendrajana, ERIC -
#TITLE_ALTERNATIVE#
by: RAHMANSYAH (NIM 12206022); Pembimbing: Dr. Ir. Taufan Marhaendrajana, FIKRI -
#TITLE_ALTERNATIVE#
by: TRIPUTRA (NIM 12206026); Pembimbing: Dr. Ir. Taufan Marhaendrajana, ALDO -
#TITLE_ALTERNATIVE#
by: PRANOTO (NIM 12206016); Pembimbing: Dr. Ir. Taufan Marhaendrajana, ARIF