#TITLE_ALTERNATIVE#

Relief well has the primary purpose of controlling or killing the crater that was uncontrolled by Blow Out Preventer operation from blowout well.<p>On this case, well-X has broken due to crater from Underground Blowout (UGBO). Whereas, UGBO is type of blowout that was happened in sub-surface a...

Full description

Saved in:
Bibliographic Details
Main Author: SYAM NURLIA (NIM 12205051); Pembimbing: Dr.-Ing.Ir.Rudi Rubiandini R.S., DIAN
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/13387
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:13387
spelling id-itb.:133872017-09-27T10:37:30Z#TITLE_ALTERNATIVE# SYAM NURLIA (NIM 12205051); Pembimbing: Dr.-Ing.Ir.Rudi Rubiandini R.S., DIAN Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/13387 Relief well has the primary purpose of controlling or killing the crater that was uncontrolled by Blow Out Preventer operation from blowout well.<p>On this case, well-X has broken due to crater from Underground Blowout (UGBO). Whereas, UGBO is type of blowout that was happened in sub-surface area and seeped into the surface or another layer outside the wellbore. The crater was caused by gas from formation that has seeped through cement's pores. Microstructures of the pores has been changed due to physical reaction caused by overburden pressure or varies chemical reaction caused by temperature. It caused micro fractures that made the porosity and the permeability of rocks became much bigger as its process. As the result, gas from formation seeped into the surface as crater.<p>Due that process, relief well was used to reach the main source of crater and kill it. The well was named after well-Y. Surface location of relief well-Y is 99,51m North East from well-X. Thus, this paper is going to discuss the relief well's process to overcome Underground Blowout (UGBO) and the result (killing and cementing process). text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Relief well has the primary purpose of controlling or killing the crater that was uncontrolled by Blow Out Preventer operation from blowout well.<p>On this case, well-X has broken due to crater from Underground Blowout (UGBO). Whereas, UGBO is type of blowout that was happened in sub-surface area and seeped into the surface or another layer outside the wellbore. The crater was caused by gas from formation that has seeped through cement's pores. Microstructures of the pores has been changed due to physical reaction caused by overburden pressure or varies chemical reaction caused by temperature. It caused micro fractures that made the porosity and the permeability of rocks became much bigger as its process. As the result, gas from formation seeped into the surface as crater.<p>Due that process, relief well was used to reach the main source of crater and kill it. The well was named after well-Y. Surface location of relief well-Y is 99,51m North East from well-X. Thus, this paper is going to discuss the relief well's process to overcome Underground Blowout (UGBO) and the result (killing and cementing process).
format Final Project
author SYAM NURLIA (NIM 12205051); Pembimbing: Dr.-Ing.Ir.Rudi Rubiandini R.S., DIAN
spellingShingle SYAM NURLIA (NIM 12205051); Pembimbing: Dr.-Ing.Ir.Rudi Rubiandini R.S., DIAN
#TITLE_ALTERNATIVE#
author_facet SYAM NURLIA (NIM 12205051); Pembimbing: Dr.-Ing.Ir.Rudi Rubiandini R.S., DIAN
author_sort SYAM NURLIA (NIM 12205051); Pembimbing: Dr.-Ing.Ir.Rudi Rubiandini R.S., DIAN
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/13387
_version_ 1820736172462178304