#TITLE_ALTERNATIVE#
Value of m often becomes something very crucially in order to estimate the reserves. Estimate value of m can use many methods from coring until logging, however value of m that obtain by that method had not yet represented by entire layer. We need to develop other method to estimate value of m which...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13491 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:13491 |
---|---|
spelling |
id-itb.:134912017-09-27T10:37:29Z#TITLE_ALTERNATIVE# ONGIRIWALU (NIM 12205027); Pembimbing: Ir. Hernansjah, GARRY Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/13491 Value of m often becomes something very crucially in order to estimate the reserves. Estimate value of m can use many methods from coring until logging, however value of m that obtain by that method had not yet represented by entire layer. We need to develop other method to estimate value of m which more represents in order to get better results. Using production data from well, we can obtain the value of m. Production data had deep information than logging and coring. Value of m by this method also can be use by other well in order to estimate saturation and reserves. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Value of m often becomes something very crucially in order to estimate the reserves. Estimate value of m can use many methods from coring until logging, however value of m that obtain by that method had not yet represented by entire layer. We need to develop other method to estimate value of m which more represents in order to get better results. Using production data from well, we can obtain the value of m. Production data had deep information than logging and coring. Value of m by this method also can be use by other well in order to estimate saturation and reserves. |
format |
Final Project |
author |
ONGIRIWALU (NIM 12205027); Pembimbing: Ir. Hernansjah, GARRY |
spellingShingle |
ONGIRIWALU (NIM 12205027); Pembimbing: Ir. Hernansjah, GARRY #TITLE_ALTERNATIVE# |
author_facet |
ONGIRIWALU (NIM 12205027); Pembimbing: Ir. Hernansjah, GARRY |
author_sort |
ONGIRIWALU (NIM 12205027); Pembimbing: Ir. Hernansjah, GARRY |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/13491 |
_version_ |
1820736202813210624 |