#TITLE_ALTERNATIVE#

Value of m often becomes something very crucially in order to estimate the reserves. Estimate value of m can use many methods from coring until logging, however value of m that obtain by that method had not yet represented by entire layer. We need to develop other method to estimate value of m which...

Full description

Saved in:
Bibliographic Details
Main Author: ONGIRIWALU (NIM 12205027); Pembimbing: Ir. Hernansjah, GARRY
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/13491
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:13491
spelling id-itb.:134912017-09-27T10:37:29Z#TITLE_ALTERNATIVE# ONGIRIWALU (NIM 12205027); Pembimbing: Ir. Hernansjah, GARRY Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/13491 Value of m often becomes something very crucially in order to estimate the reserves. Estimate value of m can use many methods from coring until logging, however value of m that obtain by that method had not yet represented by entire layer. We need to develop other method to estimate value of m which more represents in order to get better results. Using production data from well, we can obtain the value of m. Production data had deep information than logging and coring. Value of m by this method also can be use by other well in order to estimate saturation and reserves. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Value of m often becomes something very crucially in order to estimate the reserves. Estimate value of m can use many methods from coring until logging, however value of m that obtain by that method had not yet represented by entire layer. We need to develop other method to estimate value of m which more represents in order to get better results. Using production data from well, we can obtain the value of m. Production data had deep information than logging and coring. Value of m by this method also can be use by other well in order to estimate saturation and reserves.
format Final Project
author ONGIRIWALU (NIM 12205027); Pembimbing: Ir. Hernansjah, GARRY
spellingShingle ONGIRIWALU (NIM 12205027); Pembimbing: Ir. Hernansjah, GARRY
#TITLE_ALTERNATIVE#
author_facet ONGIRIWALU (NIM 12205027); Pembimbing: Ir. Hernansjah, GARRY
author_sort ONGIRIWALU (NIM 12205027); Pembimbing: Ir. Hernansjah, GARRY
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/13491
_version_ 1820736202813210624