#TITLE_ALTERNATIVE#

By the time well produce, the performance of well to produce the fluid will be decrease. Therefore, gas lift injection is needed to maximize the production from the wells. In rotative gas lift, produced gas from reservoir will be re-injection to the well . By using rotative gas lift, used of produce...

Full description

Saved in:
Bibliographic Details
Main Author: ENDAH PRASTITI (NIM 12206008); Pembimbing: Dr.Ir. Pudjo Sukarno, GESA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/13496
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:13496
spelling id-itb.:134962017-09-27T10:37:30Z#TITLE_ALTERNATIVE# ENDAH PRASTITI (NIM 12206008); Pembimbing: Dr.Ir. Pudjo Sukarno, GESA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/13496 By the time well produce, the performance of well to produce the fluid will be decrease. Therefore, gas lift injection is needed to maximize the production from the wells. In rotative gas lift, produced gas from reservoir will be re-injection to the well . By using rotative gas lift, used of produced gas from reservoir will be more efficient.<p>Rotative gas lift planning methods includes the selection of initial production rate, gas injection rate required , the scheduling of injection and gas storage for injection. The optimization done by reservoir modeling, select the best location of wells, surface facilities modeling and production optimization for 10 years. In addition, the goals in this final project is plan the gas injection, so the maximum cumulative oil production can be reached.<p>Because the daily gas production rate is not sufficient for gas injection, the scenario that developed by the writer is storing the gas production first. Gas injection applied for 4 well gradually, considering the oil production rate of each wells. Optimization also evaluated every year to determine the appropriate gas injection rate to get optimum oil production rate. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description By the time well produce, the performance of well to produce the fluid will be decrease. Therefore, gas lift injection is needed to maximize the production from the wells. In rotative gas lift, produced gas from reservoir will be re-injection to the well . By using rotative gas lift, used of produced gas from reservoir will be more efficient.<p>Rotative gas lift planning methods includes the selection of initial production rate, gas injection rate required , the scheduling of injection and gas storage for injection. The optimization done by reservoir modeling, select the best location of wells, surface facilities modeling and production optimization for 10 years. In addition, the goals in this final project is plan the gas injection, so the maximum cumulative oil production can be reached.<p>Because the daily gas production rate is not sufficient for gas injection, the scenario that developed by the writer is storing the gas production first. Gas injection applied for 4 well gradually, considering the oil production rate of each wells. Optimization also evaluated every year to determine the appropriate gas injection rate to get optimum oil production rate.
format Final Project
author ENDAH PRASTITI (NIM 12206008); Pembimbing: Dr.Ir. Pudjo Sukarno, GESA
spellingShingle ENDAH PRASTITI (NIM 12206008); Pembimbing: Dr.Ir. Pudjo Sukarno, GESA
#TITLE_ALTERNATIVE#
author_facet ENDAH PRASTITI (NIM 12206008); Pembimbing: Dr.Ir. Pudjo Sukarno, GESA
author_sort ENDAH PRASTITI (NIM 12206008); Pembimbing: Dr.Ir. Pudjo Sukarno, GESA
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/13496
_version_ 1820736204144902144