Plan of Development is very important to be conducted in oil industry, where a lot of money needed for producing an oil field. Reservoir simulation is an indispensable tool for planning the development of a reliable field for predicting realistic reservoir performance. X Field is an oil field with a...

Full description

Saved in:
Bibliographic Details
Main Author: DJAILANI (NIM 12204017); Pembimbing: Ir. Tutuka Ariadji, MSc, Ph.D., IKHWANUSHAFA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/13546
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:13546
spelling id-itb.:135462017-09-27T10:37:30Z#TITLE_ALTERNATIVE# DJAILANI (NIM 12204017); Pembimbing: Ir. Tutuka Ariadji, MSc, Ph.D., IKHWANUSHAFA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/13546 Plan of Development is very important to be conducted in oil industry, where a lot of money needed for producing an oil field. Reservoir simulation is an indispensable tool for planning the development of a reliable field for predicting realistic reservoir performance. X Field is an oil field with a complex carbonate reservoir. Amount of oil that produced from the field was very limited, it was just 2,23 % from just one well. These studies require field development by adding a few wells in a potential area. Simulation with different scenarios results in 14,02 % Recovery Factor of 3 producing wells. After simulation process, the next step is to analize economic aspect of the development scenario which is offered by reservoir simulation, and by using some capital and non capital cost assumptions we obtaine some economic indicator results, NPV Value for Government is 50,627 MUS$, NPV Value for Contractor is 8,346 MUS$, ROR is 75,6 %, POT is after 2,98 years and PI value is about 1,76. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Plan of Development is very important to be conducted in oil industry, where a lot of money needed for producing an oil field. Reservoir simulation is an indispensable tool for planning the development of a reliable field for predicting realistic reservoir performance. X Field is an oil field with a complex carbonate reservoir. Amount of oil that produced from the field was very limited, it was just 2,23 % from just one well. These studies require field development by adding a few wells in a potential area. Simulation with different scenarios results in 14,02 % Recovery Factor of 3 producing wells. After simulation process, the next step is to analize economic aspect of the development scenario which is offered by reservoir simulation, and by using some capital and non capital cost assumptions we obtaine some economic indicator results, NPV Value for Government is 50,627 MUS$, NPV Value for Contractor is 8,346 MUS$, ROR is 75,6 %, POT is after 2,98 years and PI value is about 1,76.
format Final Project
author DJAILANI (NIM 12204017); Pembimbing: Ir. Tutuka Ariadji, MSc, Ph.D., IKHWANUSHAFA
spellingShingle DJAILANI (NIM 12204017); Pembimbing: Ir. Tutuka Ariadji, MSc, Ph.D., IKHWANUSHAFA
#TITLE_ALTERNATIVE#
author_facet DJAILANI (NIM 12204017); Pembimbing: Ir. Tutuka Ariadji, MSc, Ph.D., IKHWANUSHAFA
author_sort DJAILANI (NIM 12204017); Pembimbing: Ir. Tutuka Ariadji, MSc, Ph.D., IKHWANUSHAFA
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/13546
_version_ 1820736218325843968