#TITLE_ALTERNATIVE#
After discovering coal reserves by a company, then the problem is how to define the optimum net present value and how to design the. ultimate open pit limit. It depends on two important factors (1). coal reserves model (geologic and quality model) and (2). coal open pit economic model.<p>Coal...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13893 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |