#TITLE_ALTERNATIVE#
In controlling the quality characteristics required of a proper sampling. <br /> <br /> <br /> <br /> <br /> Proper sampling can assist in determining the quality of a production. <br /> <br /> <br /> <br /> <br /> Then it is al...
Saved in:
Main Author: | MUHAMMAD RIDHO (NIM 10107030); Pembimbing : Sumanto W H M.Kom, APRIYANSYAH |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13995 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: MUHAMMAD RIDHO (NIM : 101 07 030); Pembimbing Tugas Akhir : Sumanto W H M.Kom, APRIYANSYAH -
#TITLE_ALTERNATIVE#
by: RIDHO (NIM 15103032), MUHAMMAD -
#TITLE_ALTERNATIVE#
by: PRIMA H (NIM 10107084); Pembimbing : Sumanto W.H, M.Comp., ARIZA -
#TITLE_ALTERNATIVE#
by: REINANDA (NIM 13502057), RIDHO -
#TITLE_ALTERNATIVE#
by: DESTIANTO ERMANSYAH (NIM 10107044); Pembimbing : Dr. Novriana Sumarti, RIDHO