#TITLE_ALTERNATIVE#

<p align="justify">Bandung' waste has caused a great deal of problem since early 2002. It needs an immediate solution from the authority. One of many alternatives solution is to build waste-to-energy facilities in Bandung.<p align="justify"><p>In this final...

Full description

Saved in:
Bibliographic Details
Main Author: BASUKI WIBOWO (NIM 13200031), ARIO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/14012
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:<p align="justify">Bandung' waste has caused a great deal of problem since early 2002. It needs an immediate solution from the authority. One of many alternatives solution is to build waste-to-energy facilities in Bandung.<p align="justify"><p>In this final project will be discussed about early aspects of the construction of waste-to-energy facilities in Bandung. It will also propose a basic technology for the waste-to-energy facility in Bandung, based on Bandung's waste characteristics.<p align="justify"><p>In order to propose the technology that will be used, bandung's waste characteristic and basic technology in waste-to-energy facility will be described in this report. The waste characteristic is collected by conducting laboratory analysis and the basic technology is learned by literature.<p align="justify"><p>This preliminary study of the waste-to-energy facility in Bandung will describe the combustibility of Bandung's waste and present general components that will be used in waste-to-energy facility in Bandung. <br />