#TITLE_ALTERNATIVE#
Mining jobs demand speed and accuracy on every measurement. In PT. Weda Bay Nickel, each stockpile has maximum limit of mass and volume value. If the stockpile has reached the maximum limit, a new stockpile should be made to store the minerals. The current measurements the mass of the stockpile is o...
Saved in:
Main Author: | RAMADHAN UTAMA (NIM 15107037); Pembimbing: Dr. Deni Suwardhi, ST, MT., dan Ir. Agoes Soewandit, IHSAN |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14224 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: GILANG WAHAB (NIM 15104036); Pembimbing : Dr. Deni Suwardhi, ST., MT. dan Ir. Agoes S. Soedomo,, ARKY -
#TITLE_ALTERNATIVE#
by: ANDIKA PUTRI (NIM 15107036); Pembimbing: Dr. Deni Suwardhi, ST., MT. dan Ir. Agoes Soewandito, NINDYA -
#TITLE_ALTERNATIVE#
by: ISMAIL (NIM 15104060); Pembimbing : Dr. Deni Suwardhi, ST., MT. dan Ir. Dwi Wisayantono MT., YONAN -
#TITLE_ALTERNATIVE#
by: SATYAGAMA (NIM 15109029) ; pembimbing : Dr. Deni Suwardhi, ST., MT, DILLAN -
#TITLE_ALTERNATIVE#
by: SATYAGAMA (NIM: 15109029); Pembimbing: Dr. Deni Suwardhi, ST., MT, DILLAN