#TITLE_ALTERNATIVE#
In most brownfields which has been produced for a long period time, there are many abandoned well and well which still economically to be produced. This well should be produced with waterflood injection method. There is a consideration before water flood injection, i.e. decide injection pattern. The...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14265 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |