#TITLE_ALTERNATIVE#
In developing an oil field, setting a well flow rate of production is a very important starting step. Because it will affect the oil recovery factor from the field in the future. Despite the increasing flow rate of production followed by increasing oil recovery, also could be decreasing the reservoi...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14289 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | In developing an oil field, setting a well flow rate of production is a very important starting step. Because it will affect the oil recovery factor from the field in the future. Despite the increasing flow rate of production followed by increasing oil recovery, also could be decreasing the reservoir performance and causes a water coning which inhibits the production of oil. Therefore, this study is to investigate the rate setting by considering the production of the well production data and physical properties of rocks.<p>In this paper, the authors try to analyze the performance of wells flow rate of production in the LM field, which most of the wells produce WC greater than 50%. This study identify causes of the high WC on the LM field with the water control diagnostics of KS Chan, so that we could find appropriate magnitude of each well flow rate to overcome them. Then based on the method developed by KS Chan, we try to analyze the performance of production flow rate using a commercial simulator and correlates the results with the physical properties of rocks, so a correlation has been developed to be used to predict cumulative production of a well. |
---|