Construction survey activities were defined as those activities involved the planning and implementation of surveys for the location, design, construction, operation and maintenance of civil projects and other engineering projects. One of the jobs in a construction survey of the distribution natural...

Full description

Saved in:
Bibliographic Details
Main Author: SIDDIQ (NIM 15105038); Pembimbing: Dr. Ir. S.Hendriatiningsih, MS., dan Dr. Ir. Dwi Wisayan, MIFTAHUS
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/14312
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:14312
spelling id-itb.:143122017-10-09T10:51:08Z#TITLE_ALTERNATIVE# SIDDIQ (NIM 15105038); Pembimbing: Dr. Ir. S.Hendriatiningsih, MS., dan Dr. Ir. Dwi Wisayan, MIFTAHUS Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/14312 Construction survey activities were defined as those activities involved the planning and implementation of surveys for the location, design, construction, operation and maintenance of civil projects and other engineering projects. One of the jobs in a construction survey of the distribution natural gas pipeline development was staking-out the points of the centreline from the map plan to the field. The accuracy of reached point planned could be calculated by implement stake-out accuracy equation using the data specification of the Electronic Total Station (ETS) and the deviation standard of know point. The data that used to calculated stake-out accuracy is polygon measurement data as a know point and staking-out of point design from plan map. The calculation were performed comprising horizontal angle, staking-out distance, the calculation of deviation standard of reached point planned, lenght of pipe prediction and analyzed of the deviation standard of reached point based on staking out accuracy requirement. Based on calculations performed, the deviation standard of reached point planned was smaller than the standard accuracy of the stake and there was a tendency that the accuracy was less accurately as the staking distance took longer from the starting point. The staking accuracy calculation method was advandtageous for stake planning and another applied construction survey activity. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Construction survey activities were defined as those activities involved the planning and implementation of surveys for the location, design, construction, operation and maintenance of civil projects and other engineering projects. One of the jobs in a construction survey of the distribution natural gas pipeline development was staking-out the points of the centreline from the map plan to the field. The accuracy of reached point planned could be calculated by implement stake-out accuracy equation using the data specification of the Electronic Total Station (ETS) and the deviation standard of know point. The data that used to calculated stake-out accuracy is polygon measurement data as a know point and staking-out of point design from plan map. The calculation were performed comprising horizontal angle, staking-out distance, the calculation of deviation standard of reached point planned, lenght of pipe prediction and analyzed of the deviation standard of reached point based on staking out accuracy requirement. Based on calculations performed, the deviation standard of reached point planned was smaller than the standard accuracy of the stake and there was a tendency that the accuracy was less accurately as the staking distance took longer from the starting point. The staking accuracy calculation method was advandtageous for stake planning and another applied construction survey activity.
format Final Project
author SIDDIQ (NIM 15105038); Pembimbing: Dr. Ir. S.Hendriatiningsih, MS., dan Dr. Ir. Dwi Wisayan, MIFTAHUS
spellingShingle SIDDIQ (NIM 15105038); Pembimbing: Dr. Ir. S.Hendriatiningsih, MS., dan Dr. Ir. Dwi Wisayan, MIFTAHUS
#TITLE_ALTERNATIVE#
author_facet SIDDIQ (NIM 15105038); Pembimbing: Dr. Ir. S.Hendriatiningsih, MS., dan Dr. Ir. Dwi Wisayan, MIFTAHUS
author_sort SIDDIQ (NIM 15105038); Pembimbing: Dr. Ir. S.Hendriatiningsih, MS., dan Dr. Ir. Dwi Wisayan, MIFTAHUS
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/14312
_version_ 1820737179060535296