#TITLE_ALTERNATIVE#

In this final project, ESP will be installed on 3 producing wells, after they flowing naturally. ESP selection is based on liquid flowrate sensitivity analysis by considering the oil cumulative production at the end of contract period. Liquid flowrate sensitivity also used on selecting ESP that will...

Full description

Saved in:
Bibliographic Details
Main Author: PERDANA PUTRA (NIM 12206100); Pembimbing: Dr.Ir. Pudjo Sukarno, RIA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/14432
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:In this final project, ESP will be installed on 3 producing wells, after they flowing naturally. ESP selection is based on liquid flowrate sensitivity analysis by considering the oil cumulative production at the end of contract period. Liquid flowrate sensitivity also used on selecting ESP that will be used to replace the old one.