ANALYSIS OF DREDGE STABILITY AS CONSEQUENCE OF MODIFICATION FROM ON SHORE TO OFF SHORE OPERATION

The function of dredge in operation is to dredging, transporting, and mooving the materials from deep to surface. Merapin dredge is the property of PT Koba Tin, that operation since 1987 to 2002 for land operation. Because of this dredge will activate in sea operation, so to fulfill this requirement...

Full description

Saved in:
Bibliographic Details
Main Author: JONI WIBOWO(NIM : 13104054); Pembimbing : Dr. Ir. Bagus Budiwantoro, ABAS
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/14586
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:14586
spelling id-itb.:145862017-09-27T10:40:50ZANALYSIS OF DREDGE STABILITY AS CONSEQUENCE OF MODIFICATION FROM ON SHORE TO OFF SHORE OPERATION JONI WIBOWO(NIM : 13104054); Pembimbing : Dr. Ir. Bagus Budiwantoro, ABAS Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/14586 The function of dredge in operation is to dredging, transporting, and mooving the materials from deep to surface. Merapin dredge is the property of PT Koba Tin, that operation since 1987 to 2002 for land operation. Because of this dredge will activate in sea operation, so to fulfill this requirement this ship need restoration and modification. But every dredge must be stable and feasible. The initial stability of dredge is influenced by centre of <br /> <br /> <br /> gravity and centre of bouyancy. In this final assignment to analysis the stability, the process separated by two step. (1st) weight and centre of gravity Merapin dredge existing calculation, (2nd) the calculation of merapin dredge modification stability. <br /> <br /> <br /> The result of this analysis showed that Merapin dredge always occured trim in longitudinal direction, from the consequence of change weight and centre of gravity the <br /> <br /> <br /> ladder in operation time. After the weight increase by modification, the result of final freeboard not fulfill the standard. With increasing added pontoon, and good potition <br /> <br /> <br /> arrangement like in 4th design will produce results final freeboard that fulfill the standard. From the calculation, every added pontoon will give load to connection structure <br /> <br /> <br /> around 100 ton. In each added pontoon have 8 connection structure, each other restrain load 12,5 ton. From the results of finite element analysis helped by ANSYS software, maximum of Von-Mises stress is 1,18 x 108 N/m2. This result is safe if compare with allowable stres 2,5 <br /> <br /> <br /> x 108 N/m2, and the safety factor is 2,11. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The function of dredge in operation is to dredging, transporting, and mooving the materials from deep to surface. Merapin dredge is the property of PT Koba Tin, that operation since 1987 to 2002 for land operation. Because of this dredge will activate in sea operation, so to fulfill this requirement this ship need restoration and modification. But every dredge must be stable and feasible. The initial stability of dredge is influenced by centre of <br /> <br /> <br /> gravity and centre of bouyancy. In this final assignment to analysis the stability, the process separated by two step. (1st) weight and centre of gravity Merapin dredge existing calculation, (2nd) the calculation of merapin dredge modification stability. <br /> <br /> <br /> The result of this analysis showed that Merapin dredge always occured trim in longitudinal direction, from the consequence of change weight and centre of gravity the <br /> <br /> <br /> ladder in operation time. After the weight increase by modification, the result of final freeboard not fulfill the standard. With increasing added pontoon, and good potition <br /> <br /> <br /> arrangement like in 4th design will produce results final freeboard that fulfill the standard. From the calculation, every added pontoon will give load to connection structure <br /> <br /> <br /> around 100 ton. In each added pontoon have 8 connection structure, each other restrain load 12,5 ton. From the results of finite element analysis helped by ANSYS software, maximum of Von-Mises stress is 1,18 x 108 N/m2. This result is safe if compare with allowable stres 2,5 <br /> <br /> <br /> x 108 N/m2, and the safety factor is 2,11.
format Final Project
author JONI WIBOWO(NIM : 13104054); Pembimbing : Dr. Ir. Bagus Budiwantoro, ABAS
spellingShingle JONI WIBOWO(NIM : 13104054); Pembimbing : Dr. Ir. Bagus Budiwantoro, ABAS
ANALYSIS OF DREDGE STABILITY AS CONSEQUENCE OF MODIFICATION FROM ON SHORE TO OFF SHORE OPERATION
author_facet JONI WIBOWO(NIM : 13104054); Pembimbing : Dr. Ir. Bagus Budiwantoro, ABAS
author_sort JONI WIBOWO(NIM : 13104054); Pembimbing : Dr. Ir. Bagus Budiwantoro, ABAS
title ANALYSIS OF DREDGE STABILITY AS CONSEQUENCE OF MODIFICATION FROM ON SHORE TO OFF SHORE OPERATION
title_short ANALYSIS OF DREDGE STABILITY AS CONSEQUENCE OF MODIFICATION FROM ON SHORE TO OFF SHORE OPERATION
title_full ANALYSIS OF DREDGE STABILITY AS CONSEQUENCE OF MODIFICATION FROM ON SHORE TO OFF SHORE OPERATION
title_fullStr ANALYSIS OF DREDGE STABILITY AS CONSEQUENCE OF MODIFICATION FROM ON SHORE TO OFF SHORE OPERATION
title_full_unstemmed ANALYSIS OF DREDGE STABILITY AS CONSEQUENCE OF MODIFICATION FROM ON SHORE TO OFF SHORE OPERATION
title_sort analysis of dredge stability as consequence of modification from on shore to off shore operation
url https://digilib.itb.ac.id/gdl/view/14586
_version_ 1820737262094123008