WORKLOAD EVALUATION OF LAND CREW INDONESIAN RAILWAY INDUSTRY STUDY AT OPERATION AREA 2 BANDUNG

Today, Train accidents are still happening. One of which factors that cause accidents is the human factor. Human factors mentioned often the cause of a train accident is a machinist. Machinist does not work alone. He requires coordination with the ground crew. That ground crew was the control center...

Full description

Saved in:
Bibliographic Details
Main Author: GEOVANIA A (NIM : 23412019), ADE
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/14622
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:14622
spelling id-itb.:146222017-09-27T14:50:37ZWORKLOAD EVALUATION OF LAND CREW INDONESIAN RAILWAY INDUSTRY STUDY AT OPERATION AREA 2 BANDUNG GEOVANIA A (NIM : 23412019), ADE Manajemen umum Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/14622 Today, Train accidents are still happening. One of which factors that cause accidents is the human factor. Human factors mentioned often the cause of a train accident is a machinist. Machinist does not work alone. He requires coordination with the ground crew. That ground crew was the control center and the train trip leader. This suggests that there may be a train wreck relation to the workload of employee support (ground crew). Workload evaluation is such an important things to do as an effort to reduce workplace accidents that will occur. The purpose of this study was to evaluate the workload that is owned by the ground crew and propose solutions related to the evaluation of the ground crew’s workload in PT Kereta Api Indonesia (PT KAI). Workload evaluation was performed by the approach to the fatigue concept, stress and sleepiness. These three concepts are used to using 4 tools that are questionnaires Swedish Occupational Fatigue Inventory (SOFI), Karolinska Sleepiness Scale (KSS), psychomotor Vigilance Test (PVT) and amylase levels using Cocorometer. <br /> <br /> <br /> <br /> <br /> The study was showed that the workload of personnel ground crew classified in mid type, based on the results of measurements that have been carried out by using such as perception of fatigue, sleepiness, salivary amylase and reaction time from respondents. Based on the perception of fatigue, physical discomfort and lack of motivation are proven significantly different. Drowsiness level between before work and after work affects fatigue. Reaction time measurement results concluded that the average reaction time speeds 80% faster than standard, while based on the level of amylase which measures the stress level of the respondents stated that the ground crew employee has a condition that is very stressful even before work. These stress conditions then declines with hours of work done. The suggestion that shoud be given is the setting work hours and hours of extra work (if necessary), structuring work to optimize the layout of the range, call for rest and immediately implement the fatigue management. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
GEOVANIA A (NIM : 23412019), ADE
WORKLOAD EVALUATION OF LAND CREW INDONESIAN RAILWAY INDUSTRY STUDY AT OPERATION AREA 2 BANDUNG
description Today, Train accidents are still happening. One of which factors that cause accidents is the human factor. Human factors mentioned often the cause of a train accident is a machinist. Machinist does not work alone. He requires coordination with the ground crew. That ground crew was the control center and the train trip leader. This suggests that there may be a train wreck relation to the workload of employee support (ground crew). Workload evaluation is such an important things to do as an effort to reduce workplace accidents that will occur. The purpose of this study was to evaluate the workload that is owned by the ground crew and propose solutions related to the evaluation of the ground crew’s workload in PT Kereta Api Indonesia (PT KAI). Workload evaluation was performed by the approach to the fatigue concept, stress and sleepiness. These three concepts are used to using 4 tools that are questionnaires Swedish Occupational Fatigue Inventory (SOFI), Karolinska Sleepiness Scale (KSS), psychomotor Vigilance Test (PVT) and amylase levels using Cocorometer. <br /> <br /> <br /> <br /> <br /> The study was showed that the workload of personnel ground crew classified in mid type, based on the results of measurements that have been carried out by using such as perception of fatigue, sleepiness, salivary amylase and reaction time from respondents. Based on the perception of fatigue, physical discomfort and lack of motivation are proven significantly different. Drowsiness level between before work and after work affects fatigue. Reaction time measurement results concluded that the average reaction time speeds 80% faster than standard, while based on the level of amylase which measures the stress level of the respondents stated that the ground crew employee has a condition that is very stressful even before work. These stress conditions then declines with hours of work done. The suggestion that shoud be given is the setting work hours and hours of extra work (if necessary), structuring work to optimize the layout of the range, call for rest and immediately implement the fatigue management.
format Theses
author GEOVANIA A (NIM : 23412019), ADE
author_facet GEOVANIA A (NIM : 23412019), ADE
author_sort GEOVANIA A (NIM : 23412019), ADE
title WORKLOAD EVALUATION OF LAND CREW INDONESIAN RAILWAY INDUSTRY STUDY AT OPERATION AREA 2 BANDUNG
title_short WORKLOAD EVALUATION OF LAND CREW INDONESIAN RAILWAY INDUSTRY STUDY AT OPERATION AREA 2 BANDUNG
title_full WORKLOAD EVALUATION OF LAND CREW INDONESIAN RAILWAY INDUSTRY STUDY AT OPERATION AREA 2 BANDUNG
title_fullStr WORKLOAD EVALUATION OF LAND CREW INDONESIAN RAILWAY INDUSTRY STUDY AT OPERATION AREA 2 BANDUNG
title_full_unstemmed WORKLOAD EVALUATION OF LAND CREW INDONESIAN RAILWAY INDUSTRY STUDY AT OPERATION AREA 2 BANDUNG
title_sort workload evaluation of land crew indonesian railway industry study at operation area 2 bandung
url https://digilib.itb.ac.id/gdl/view/14622
_version_ 1820737270026600448