REVERSE ENGINEERING OF WELDING POSITIONER AND IT̉̉S MANUFACTURING COST ESTIMATION
PT. Great make the turbin runner by assembling and welding the ring, cone, and the blade into one unit of the turbine runner. There are many sections to be welded and some of them are in a difficult position to reach resulting fixture had to be dismantled of the table. But the fixture-dismantled ste...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14876 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!