STUDY OF COMBINATION OF BOILER OPERATION IN NICKEL PLANT

Steam production in nickel processing plant is an absolute need to support process and equipment. Nickel production fluctuated against time as the consequence of problems that occur during production. This makes boiler operation cost to become far from efficient. Thus, the combination of boilers ope...

Full description

Saved in:
Bibliographic Details
Main Author: RIVERA (NIM : 13104094); Pembimbing Utama : Dr. Ir. Prihadi Setyo Darmanto, BOBBY
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/15180
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:15180
spelling id-itb.:151802017-09-27T10:40:52ZSTUDY OF COMBINATION OF BOILER OPERATION IN NICKEL PLANT RIVERA (NIM : 13104094); Pembimbing Utama : Dr. Ir. Prihadi Setyo Darmanto, BOBBY Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/15180 Steam production in nickel processing plant is an absolute need to support process and equipment. Nickel production fluctuated against time as the consequence of problems that occur during production. This makes boiler operation cost to become far from efficient. Thus, the combination of boilers operation is required in order to produce steam that match to the nickel production with the main objective to save the operating cost. <br /> <br /> <br /> This research work has the main goal to get some operational combination of some boilers with the main criteria minimum production cost and steam quality. <br /> <br /> <br /> Finally, the result of combination of boilers operation is proposed based on the required steam quality needed during the process with the minimum operation cost. For steam flow 15 ton/hour until 25 ton/hour. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Steam production in nickel processing plant is an absolute need to support process and equipment. Nickel production fluctuated against time as the consequence of problems that occur during production. This makes boiler operation cost to become far from efficient. Thus, the combination of boilers operation is required in order to produce steam that match to the nickel production with the main objective to save the operating cost. <br /> <br /> <br /> This research work has the main goal to get some operational combination of some boilers with the main criteria minimum production cost and steam quality. <br /> <br /> <br /> Finally, the result of combination of boilers operation is proposed based on the required steam quality needed during the process with the minimum operation cost. For steam flow 15 ton/hour until 25 ton/hour.
format Final Project
author RIVERA (NIM : 13104094); Pembimbing Utama : Dr. Ir. Prihadi Setyo Darmanto, BOBBY
spellingShingle RIVERA (NIM : 13104094); Pembimbing Utama : Dr. Ir. Prihadi Setyo Darmanto, BOBBY
STUDY OF COMBINATION OF BOILER OPERATION IN NICKEL PLANT
author_facet RIVERA (NIM : 13104094); Pembimbing Utama : Dr. Ir. Prihadi Setyo Darmanto, BOBBY
author_sort RIVERA (NIM : 13104094); Pembimbing Utama : Dr. Ir. Prihadi Setyo Darmanto, BOBBY
title STUDY OF COMBINATION OF BOILER OPERATION IN NICKEL PLANT
title_short STUDY OF COMBINATION OF BOILER OPERATION IN NICKEL PLANT
title_full STUDY OF COMBINATION OF BOILER OPERATION IN NICKEL PLANT
title_fullStr STUDY OF COMBINATION OF BOILER OPERATION IN NICKEL PLANT
title_full_unstemmed STUDY OF COMBINATION OF BOILER OPERATION IN NICKEL PLANT
title_sort study of combination of boiler operation in nickel plant
url https://digilib.itb.ac.id/gdl/view/15180
_version_ 1820737411518300160