BUSINESS PROCESS ANALYSIS FOR IMPROVEMENT IN INDUSTRIAL MACHINE & SERVICE DIVISION, PT PINDAD

As a company dealing in large array of product and services, PT.Pindad has various division worked in different way to satisfy different customer. One of this division is the division of industrial engineering and service(mijas division), which is the base for this <br /> <br /> <br...

Full description

Saved in:
Bibliographic Details
Main Author: (NIM : 29108061); Pembimbing: Dr. Ir. Mursyid. HB, HAIKAL
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/15831
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:15831
spelling id-itb.:158312017-09-27T15:30:53ZBUSINESS PROCESS ANALYSIS FOR IMPROVEMENT IN INDUSTRIAL MACHINE & SERVICE DIVISION, PT PINDAD (NIM : 29108061); Pembimbing: Dr. Ir. Mursyid. HB, HAIKAL Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/15831 As a company dealing in large array of product and services, PT.Pindad has various division worked in different way to satisfy different customer. One of this division is the division of industrial engineering and service(mijas division), which is the base for this <br /> <br /> <br /> research workplace. As an old and fairly independent division of PT Pindad, mijas division has develop its own business process for all aspect. In this study there have been interview and analysis of the condition inside the division and the result is that some of the biggest <br /> <br /> <br /> current issue of the division is the late delivery time of its product which reach to 24 days/project on average. After further analysis, this lateness of delivery is concluded to be originated from the over complexity of its business process. Some report on the time schedule, and the original business process used by the division has been put on this research as an evidence of this problem. In this study, the BPMN standard will be used to build a model of the division business process. The BPMN standard is taken because it is an activity based standard that consider time flow and the action taker inside a process. To improve the existing process, at first they are converted into BPMN model, and then the redundant and unnecessary activities are being analyzed and eliminated. The result is being made into a new business process scheme. The result of these solution is an 11 day improvement of the overall business process, which result in the avoidance of late of delivery sanction in most contract clausul. There is also other side suggestion to solve the late of delivery issue outside of the business process, including joint database sistem and human resource training. The overall solution is then made into an application schedule and after some calculation, result in expected saving of <br /> <br /> <br /> about Rp 18.79Billion. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description As a company dealing in large array of product and services, PT.Pindad has various division worked in different way to satisfy different customer. One of this division is the division of industrial engineering and service(mijas division), which is the base for this <br /> <br /> <br /> research workplace. As an old and fairly independent division of PT Pindad, mijas division has develop its own business process for all aspect. In this study there have been interview and analysis of the condition inside the division and the result is that some of the biggest <br /> <br /> <br /> current issue of the division is the late delivery time of its product which reach to 24 days/project on average. After further analysis, this lateness of delivery is concluded to be originated from the over complexity of its business process. Some report on the time schedule, and the original business process used by the division has been put on this research as an evidence of this problem. In this study, the BPMN standard will be used to build a model of the division business process. The BPMN standard is taken because it is an activity based standard that consider time flow and the action taker inside a process. To improve the existing process, at first they are converted into BPMN model, and then the redundant and unnecessary activities are being analyzed and eliminated. The result is being made into a new business process scheme. The result of these solution is an 11 day improvement of the overall business process, which result in the avoidance of late of delivery sanction in most contract clausul. There is also other side suggestion to solve the late of delivery issue outside of the business process, including joint database sistem and human resource training. The overall solution is then made into an application schedule and after some calculation, result in expected saving of <br /> <br /> <br /> about Rp 18.79Billion.
format Theses
author (NIM : 29108061); Pembimbing: Dr. Ir. Mursyid. HB, HAIKAL
spellingShingle (NIM : 29108061); Pembimbing: Dr. Ir. Mursyid. HB, HAIKAL
BUSINESS PROCESS ANALYSIS FOR IMPROVEMENT IN INDUSTRIAL MACHINE & SERVICE DIVISION, PT PINDAD
author_facet (NIM : 29108061); Pembimbing: Dr. Ir. Mursyid. HB, HAIKAL
author_sort (NIM : 29108061); Pembimbing: Dr. Ir. Mursyid. HB, HAIKAL
title BUSINESS PROCESS ANALYSIS FOR IMPROVEMENT IN INDUSTRIAL MACHINE & SERVICE DIVISION, PT PINDAD
title_short BUSINESS PROCESS ANALYSIS FOR IMPROVEMENT IN INDUSTRIAL MACHINE & SERVICE DIVISION, PT PINDAD
title_full BUSINESS PROCESS ANALYSIS FOR IMPROVEMENT IN INDUSTRIAL MACHINE & SERVICE DIVISION, PT PINDAD
title_fullStr BUSINESS PROCESS ANALYSIS FOR IMPROVEMENT IN INDUSTRIAL MACHINE & SERVICE DIVISION, PT PINDAD
title_full_unstemmed BUSINESS PROCESS ANALYSIS FOR IMPROVEMENT IN INDUSTRIAL MACHINE & SERVICE DIVISION, PT PINDAD
title_sort business process analysis for improvement in industrial machine & service division, pt pindad
url https://digilib.itb.ac.id/gdl/view/15831
_version_ 1820737557922578432