OPTIMIZATION OF OVERBURDEN DISTRIBUTION USING LINEAR PROGRAMMING AT GRASBERG OPEN PIT

Grasberg open pit one of the biggest copper and gold deposit in the world that is operated by PT Freeport Indonesia in district Mimika province of Papua. The rock <br /> <br /> <br /> type and the structure of this mine is very complex as the result of the deposit forming that wa...

Full description

Saved in:
Bibliographic Details
Main Author: MAHAYASA (NIM : 29107134); Pembimbing: Ir. Rudy Bekti, MM, MADE
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/16327
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:16327
spelling id-itb.:163272017-09-27T15:30:51ZOPTIMIZATION OF OVERBURDEN DISTRIBUTION USING LINEAR PROGRAMMING AT GRASBERG OPEN PIT MAHAYASA (NIM : 29107134); Pembimbing: Ir. Rudy Bekti, MM, MADE Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/16327 Grasberg open pit one of the biggest copper and gold deposit in the world that is operated by PT Freeport Indonesia in district Mimika province of Papua. The rock <br /> <br /> <br /> type and the structure of this mine is very complex as the result of the deposit forming that was complex too. As the open pit, Grasberg produces ore and <br /> <br /> <br /> overburden. The ore will be mined and hauled to Mill after crushed by crusher and transported using belt conveyor. The overburden will be dug and hauled to dump <br /> <br /> <br /> area. Grasberg pit has 21 rock type of overburden. These rock can not be dumped to all dump area because they have different criteria and accept specific rock type only. The Long Range Planning do the forecast each quarter including mine and dump plan. One of the task during forecasting is distributing overburden from each phase to each dump for each period (monthly, quaterly, and yearly) matching with the dump criteria and priority. This job was done manually for monthly plan of the current year and get help from Minesight Strategic Planner (MSP) for life of mine. MSP distribute the overburden based on the shortest path. This final project will review the benefit of using linear programming in the overburden distribution for long range planning. Using the same parameter, the result of this optimization is compared to the current system. The result shows the benefit of using linear programming is increasing the NPV by US $ 30.1 millions for life of mine in year 2009 – 2015. The implementation of linear programming in the overburden distribution need some preparations and take about one month. The cost of software is low as compared to the benefit. Therefore this system will help optimizing the overburden <br /> <br /> <br /> distribution to get lower operating cost and this system will reduce the load of mine engineer to do his task. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Grasberg open pit one of the biggest copper and gold deposit in the world that is operated by PT Freeport Indonesia in district Mimika province of Papua. The rock <br /> <br /> <br /> type and the structure of this mine is very complex as the result of the deposit forming that was complex too. As the open pit, Grasberg produces ore and <br /> <br /> <br /> overburden. The ore will be mined and hauled to Mill after crushed by crusher and transported using belt conveyor. The overburden will be dug and hauled to dump <br /> <br /> <br /> area. Grasberg pit has 21 rock type of overburden. These rock can not be dumped to all dump area because they have different criteria and accept specific rock type only. The Long Range Planning do the forecast each quarter including mine and dump plan. One of the task during forecasting is distributing overburden from each phase to each dump for each period (monthly, quaterly, and yearly) matching with the dump criteria and priority. This job was done manually for monthly plan of the current year and get help from Minesight Strategic Planner (MSP) for life of mine. MSP distribute the overburden based on the shortest path. This final project will review the benefit of using linear programming in the overburden distribution for long range planning. Using the same parameter, the result of this optimization is compared to the current system. The result shows the benefit of using linear programming is increasing the NPV by US $ 30.1 millions for life of mine in year 2009 – 2015. The implementation of linear programming in the overburden distribution need some preparations and take about one month. The cost of software is low as compared to the benefit. Therefore this system will help optimizing the overburden <br /> <br /> <br /> distribution to get lower operating cost and this system will reduce the load of mine engineer to do his task.
format Theses
author MAHAYASA (NIM : 29107134); Pembimbing: Ir. Rudy Bekti, MM, MADE
spellingShingle MAHAYASA (NIM : 29107134); Pembimbing: Ir. Rudy Bekti, MM, MADE
OPTIMIZATION OF OVERBURDEN DISTRIBUTION USING LINEAR PROGRAMMING AT GRASBERG OPEN PIT
author_facet MAHAYASA (NIM : 29107134); Pembimbing: Ir. Rudy Bekti, MM, MADE
author_sort MAHAYASA (NIM : 29107134); Pembimbing: Ir. Rudy Bekti, MM, MADE
title OPTIMIZATION OF OVERBURDEN DISTRIBUTION USING LINEAR PROGRAMMING AT GRASBERG OPEN PIT
title_short OPTIMIZATION OF OVERBURDEN DISTRIBUTION USING LINEAR PROGRAMMING AT GRASBERG OPEN PIT
title_full OPTIMIZATION OF OVERBURDEN DISTRIBUTION USING LINEAR PROGRAMMING AT GRASBERG OPEN PIT
title_fullStr OPTIMIZATION OF OVERBURDEN DISTRIBUTION USING LINEAR PROGRAMMING AT GRASBERG OPEN PIT
title_full_unstemmed OPTIMIZATION OF OVERBURDEN DISTRIBUTION USING LINEAR PROGRAMMING AT GRASBERG OPEN PIT
title_sort optimization of overburden distribution using linear programming at grasberg open pit
url https://digilib.itb.ac.id/gdl/view/16327
_version_ 1820745345141833728