THERMODYNAMICS STUDIES OF THIRD UNIT TURBINE’S ELECTRIC POWER DISTRIBUTION AT GUNUNG SALAK GEOTHERMAL POWER PLANT

Indonesia is blessed with its abundant potential of renewable energy resources. It is believed that by some effective and optimal utilization would help Indonesia overcome the crisis of energy and resolve the classic problems in the utilization of conventional energy resources such as the availabili...

Full description

Saved in:
Bibliographic Details
Main Author: (NIM : 13104119); Dosen Pembimbing, : Ir. Pawito Merto Sontowiro,MSc, MAHENDRATA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/16332
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:16332
spelling id-itb.:163322017-09-27T10:40:55ZTHERMODYNAMICS STUDIES OF THIRD UNIT TURBINE’S ELECTRIC POWER DISTRIBUTION AT GUNUNG SALAK GEOTHERMAL POWER PLANT (NIM : 13104119); Dosen Pembimbing, : Ir. Pawito Merto Sontowiro,MSc, MAHENDRATA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/16332 Indonesia is blessed with its abundant potential of renewable energy resources. It is believed that by some effective and optimal utilization would help Indonesia overcome the crisis of energy and resolve the classic problems in the utilization of conventional energy resources such as the availability of fuel supply and <br /> <br /> <br /> its negative effects to environment. Geothermal energy is one of the energy resources that has enormous potential in Indonesia. Its potential reached 27,000 MW. Instead <br /> <br /> <br /> of developing systems and new technologies research, the study of systems and equipment that have been applied should be done to enrich the literacy and improve <br /> <br /> <br /> understanding of the technology in PLTP as part of exploiting the huge potential optimally. <br /> <br /> <br /> The following final project is focusing on tracing the power distribution at each level of the turbine. Therefore, there would be some studies and calculations <br /> <br /> <br /> conducted here, such as the thermodynamic variables that affect the electric power based on the dimensions of data and operation data obtained by the method of trial and error to find the optimal value. With the steam flow rate considered constant throughout the flow inside the turbine, the main variables that affect the calculation of the absolute velocity are only going to be the angle of steam into blade, the degree of reaction and the relative velocity angle blade steam. <br /> <br /> <br /> The result of this final project is to obtain the distribution of power at each level of the turbine with a combination of the main variables that achieve greater <br /> <br /> <br /> value and vapor pressure turbine before entering the final level of turbine which is remained dataless. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Indonesia is blessed with its abundant potential of renewable energy resources. It is believed that by some effective and optimal utilization would help Indonesia overcome the crisis of energy and resolve the classic problems in the utilization of conventional energy resources such as the availability of fuel supply and <br /> <br /> <br /> its negative effects to environment. Geothermal energy is one of the energy resources that has enormous potential in Indonesia. Its potential reached 27,000 MW. Instead <br /> <br /> <br /> of developing systems and new technologies research, the study of systems and equipment that have been applied should be done to enrich the literacy and improve <br /> <br /> <br /> understanding of the technology in PLTP as part of exploiting the huge potential optimally. <br /> <br /> <br /> The following final project is focusing on tracing the power distribution at each level of the turbine. Therefore, there would be some studies and calculations <br /> <br /> <br /> conducted here, such as the thermodynamic variables that affect the electric power based on the dimensions of data and operation data obtained by the method of trial and error to find the optimal value. With the steam flow rate considered constant throughout the flow inside the turbine, the main variables that affect the calculation of the absolute velocity are only going to be the angle of steam into blade, the degree of reaction and the relative velocity angle blade steam. <br /> <br /> <br /> The result of this final project is to obtain the distribution of power at each level of the turbine with a combination of the main variables that achieve greater <br /> <br /> <br /> value and vapor pressure turbine before entering the final level of turbine which is remained dataless.
format Final Project
author (NIM : 13104119); Dosen Pembimbing, : Ir. Pawito Merto Sontowiro,MSc, MAHENDRATA
spellingShingle (NIM : 13104119); Dosen Pembimbing, : Ir. Pawito Merto Sontowiro,MSc, MAHENDRATA
THERMODYNAMICS STUDIES OF THIRD UNIT TURBINE’S ELECTRIC POWER DISTRIBUTION AT GUNUNG SALAK GEOTHERMAL POWER PLANT
author_facet (NIM : 13104119); Dosen Pembimbing, : Ir. Pawito Merto Sontowiro,MSc, MAHENDRATA
author_sort (NIM : 13104119); Dosen Pembimbing, : Ir. Pawito Merto Sontowiro,MSc, MAHENDRATA
title THERMODYNAMICS STUDIES OF THIRD UNIT TURBINE’S ELECTRIC POWER DISTRIBUTION AT GUNUNG SALAK GEOTHERMAL POWER PLANT
title_short THERMODYNAMICS STUDIES OF THIRD UNIT TURBINE’S ELECTRIC POWER DISTRIBUTION AT GUNUNG SALAK GEOTHERMAL POWER PLANT
title_full THERMODYNAMICS STUDIES OF THIRD UNIT TURBINE’S ELECTRIC POWER DISTRIBUTION AT GUNUNG SALAK GEOTHERMAL POWER PLANT
title_fullStr THERMODYNAMICS STUDIES OF THIRD UNIT TURBINE’S ELECTRIC POWER DISTRIBUTION AT GUNUNG SALAK GEOTHERMAL POWER PLANT
title_full_unstemmed THERMODYNAMICS STUDIES OF THIRD UNIT TURBINE’S ELECTRIC POWER DISTRIBUTION AT GUNUNG SALAK GEOTHERMAL POWER PLANT
title_sort thermodynamics studies of third unit turbineãƒâ€šã‚’s electric power distribution at gunung salak geothermal power plant
url https://digilib.itb.ac.id/gdl/view/16332
_version_ 1820745346266955776