DETERMINING STRIPPING RATIO LEVEL IN OPTIMIZING PRODUCTION COST AS THE OPTIMIZATION OF TOTAL PRODUCTION COST OF COAL OPEN MINING OF PT.MEGA PRIMA PERSADA (Site Visit on Coal Industry in Sanga-Sanga, East Kalimantan, Indonesia)

East Kalimantan is one of Indonesia’s provinces that has a significant mineable coal resource and also could be mined easily with opn pit method. This province are also have many rivers facilitating for coal distribution a it is cheaper than those with ground transport. Estimated coal reserves in...

Full description

Saved in:
Bibliographic Details
Main Author: RICARDO (NIM : 29107387); Pembimbing : Ir. Uke MPP. Siahaan, MBA, MAXIMILLIAN
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/16404
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:16404
spelling id-itb.:164042017-09-27T15:30:54ZDETERMINING STRIPPING RATIO LEVEL IN OPTIMIZING PRODUCTION COST AS THE OPTIMIZATION OF TOTAL PRODUCTION COST OF COAL OPEN MINING OF PT.MEGA PRIMA PERSADA (Site Visit on Coal Industry in Sanga-Sanga, East Kalimantan, Indonesia) RICARDO (NIM : 29107387); Pembimbing : Ir. Uke MPP. Siahaan, MBA, MAXIMILLIAN Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/16404 East Kalimantan is one of Indonesia’s provinces that has a significant mineable coal resource and also could be mined easily with opn pit method. This province are also have many rivers facilitating for coal distribution a it is cheaper than those with ground transport. Estimated coal reserves in East Kalimantan is approximately 14,62% from 90.5 billion metric ton of total indonesian coal reserves. At present productivity rate, indonesian coal could be mined up to 150 years. The main problem happened at this moment is a decreasing coal price at the market. It made miners can not afford to increase their productivity output (coal) because the total cost will exceed and diminish the expected gross profit while the coal offering price continue to decline. There are several parameters that influence the change of stripping ratio. Two of them are coal price index based on Indonesian Coal Index and also fluctuating production cost which mainly contributed by fuel price published biweekly. This final project analyzed various stripping ratio based on cost structure calculation which then will be compared with coal price at the real market in coal industry, to estimate the most appropriate mining operation level for PT.Mega Prima Persada. The strategy of coal mining operation level analysis in this final project is tended on the spot contract with customer. The consideration of using this strategy toward short contract is caused by proposed coal price fluctuation in the short period. According to that consideration so the adjustment of this operation level strategy will be held and proposed monthly. Cost structure calculation applied toward various operation level determined by stripping ratio, considered to coal price at the market. Result of analysis showed that the optimum operation level that was still brought feasible profit in April and May 2009 on coal price range in April 2009 is 1 : 8 with average 64% contribution from variable cost. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description East Kalimantan is one of Indonesia’s provinces that has a significant mineable coal resource and also could be mined easily with opn pit method. This province are also have many rivers facilitating for coal distribution a it is cheaper than those with ground transport. Estimated coal reserves in East Kalimantan is approximately 14,62% from 90.5 billion metric ton of total indonesian coal reserves. At present productivity rate, indonesian coal could be mined up to 150 years. The main problem happened at this moment is a decreasing coal price at the market. It made miners can not afford to increase their productivity output (coal) because the total cost will exceed and diminish the expected gross profit while the coal offering price continue to decline. There are several parameters that influence the change of stripping ratio. Two of them are coal price index based on Indonesian Coal Index and also fluctuating production cost which mainly contributed by fuel price published biweekly. This final project analyzed various stripping ratio based on cost structure calculation which then will be compared with coal price at the real market in coal industry, to estimate the most appropriate mining operation level for PT.Mega Prima Persada. The strategy of coal mining operation level analysis in this final project is tended on the spot contract with customer. The consideration of using this strategy toward short contract is caused by proposed coal price fluctuation in the short period. According to that consideration so the adjustment of this operation level strategy will be held and proposed monthly. Cost structure calculation applied toward various operation level determined by stripping ratio, considered to coal price at the market. Result of analysis showed that the optimum operation level that was still brought feasible profit in April and May 2009 on coal price range in April 2009 is 1 : 8 with average 64% contribution from variable cost.
format Theses
author RICARDO (NIM : 29107387); Pembimbing : Ir. Uke MPP. Siahaan, MBA, MAXIMILLIAN
spellingShingle RICARDO (NIM : 29107387); Pembimbing : Ir. Uke MPP. Siahaan, MBA, MAXIMILLIAN
DETERMINING STRIPPING RATIO LEVEL IN OPTIMIZING PRODUCTION COST AS THE OPTIMIZATION OF TOTAL PRODUCTION COST OF COAL OPEN MINING OF PT.MEGA PRIMA PERSADA (Site Visit on Coal Industry in Sanga-Sanga, East Kalimantan, Indonesia)
author_facet RICARDO (NIM : 29107387); Pembimbing : Ir. Uke MPP. Siahaan, MBA, MAXIMILLIAN
author_sort RICARDO (NIM : 29107387); Pembimbing : Ir. Uke MPP. Siahaan, MBA, MAXIMILLIAN
title DETERMINING STRIPPING RATIO LEVEL IN OPTIMIZING PRODUCTION COST AS THE OPTIMIZATION OF TOTAL PRODUCTION COST OF COAL OPEN MINING OF PT.MEGA PRIMA PERSADA (Site Visit on Coal Industry in Sanga-Sanga, East Kalimantan, Indonesia)
title_short DETERMINING STRIPPING RATIO LEVEL IN OPTIMIZING PRODUCTION COST AS THE OPTIMIZATION OF TOTAL PRODUCTION COST OF COAL OPEN MINING OF PT.MEGA PRIMA PERSADA (Site Visit on Coal Industry in Sanga-Sanga, East Kalimantan, Indonesia)
title_full DETERMINING STRIPPING RATIO LEVEL IN OPTIMIZING PRODUCTION COST AS THE OPTIMIZATION OF TOTAL PRODUCTION COST OF COAL OPEN MINING OF PT.MEGA PRIMA PERSADA (Site Visit on Coal Industry in Sanga-Sanga, East Kalimantan, Indonesia)
title_fullStr DETERMINING STRIPPING RATIO LEVEL IN OPTIMIZING PRODUCTION COST AS THE OPTIMIZATION OF TOTAL PRODUCTION COST OF COAL OPEN MINING OF PT.MEGA PRIMA PERSADA (Site Visit on Coal Industry in Sanga-Sanga, East Kalimantan, Indonesia)
title_full_unstemmed DETERMINING STRIPPING RATIO LEVEL IN OPTIMIZING PRODUCTION COST AS THE OPTIMIZATION OF TOTAL PRODUCTION COST OF COAL OPEN MINING OF PT.MEGA PRIMA PERSADA (Site Visit on Coal Industry in Sanga-Sanga, East Kalimantan, Indonesia)
title_sort determining stripping ratio level in optimizing production cost as the optimization of total production cost of coal open mining of pt.mega prima persada (site visit on coal industry in sanga-sanga, east kalimantan, indonesia)
url https://digilib.itb.ac.id/gdl/view/16404
_version_ 1820745367050780672