#TITLE_ALTERNATIVE#
Determining the optimal horizontal well length with the corresponding direction is one of the most important process in gas field production. Generally, that process is done by using trial and error procedure with a simulator. In this study, the optimal horizontal well length and direction will be f...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/16835 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!