DESIGN, MANUFACTURING, AND TESTING OF TWISTED̉̉DARRIEUS WIND TURBINE AS ELECTRICAL POWER GENERATOR FOR BTS TOWER
Indonesia's energy problems increase along with increasing national energy demand. These conditions made worse by the high dependence of national energy to fossil fuel while the reserves are limited from year to year. Telecomunication as one of sectors that is growing rapidly in line with indon...
Saved in:
Main Author: | LESTALUHU (NIM : 13105071); Pembimbing 1 : Prof. Dr. Ir. T. A. Fauzi Soelaiman Pembimbi, RAKSHIDATU |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/16920 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SIMULATION, OPTIMIZATION, AND DESIGN OF VERTICAL AXIS WIND TURBINE FOR BTS TOWER
by: ANGGUN PUTRA (NIM : 13105044); Pembimbing 1: Dr. Ir. T. A. Fauzi Soelaiman; Pembimbing 2 : Dr. , BIMA -
A Review on the Evolution of Darrieus Vertical Axis Wind Turbine: Small Wind Turbines
by: Kumar, Palanisamy Mohan, et al.
Published: (2019) -
Design, Manufacturing and Testing of Wind Turbine as Back up of BTS Power Supply
by: MUHARAMSYAH BACHTIAR (NIM 13103038), SANDHY -
SIMULATION OF THREE DIMENSIONAL FLOW OVER DARRIEUS WIND TURBINE TYPE-H
by: RISATRIO (NIM : 13606008); Pembimbing : Dr. Firman Hartono ST. MT. , ALIF -
OPTIMATION OF STRAIGHT BLADE DARRIEUS TURBINE USING AS HYDRO TURBINE
by: ROSIADI (NIM: 23107010), JEFRI