POWER PLANT CAPACITY DETERMINATION AND FUNDAMENTALS DESIGN FOR KOTABARU REGION SOUTH BORNEO PROVINCE

Power plant master plan is a document about comprehensive concept of power plant development planning. Its advantage is to coordinate the preparations for more detailed power plant development plan. In this final project, the power <br /> <br /> <br /> plant master plan is limite...

Full description

Saved in:
Bibliographic Details
Main Author: (NIM : 13104004); Pembimbing Dr. Ir. Ari Darmawan Pasek, RIFANDI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17004
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:17004
spelling id-itb.:170042017-09-27T10:40:49Z POWER PLANT CAPACITY DETERMINATION AND FUNDAMENTALS DESIGN FOR KOTABARU REGION SOUTH BORNEO PROVINCE (NIM : 13104004); Pembimbing Dr. Ir. Ari Darmawan Pasek, RIFANDI Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/17004 Power plant master plan is a document about comprehensive concept of power plant development planning. Its advantage is to coordinate the preparations for more detailed power plant development plan. In this final project, the power <br /> <br /> <br /> plant master plan is limited to capacity determination, choosing kind of power plant, power plant fundamentals design, and financial aspects. <br /> <br /> <br /> The final project estimates the electricity demand of Kotabaru, South Borneo Province, for the next ten years. The estimation is conducted with two approaches: population growth and gross domestic regional income. Afterwards, it <br /> <br /> <br /> is considered to choose the suitable kind of power plant with pair-wise comparison method. The next step is energy analysis using Cycle-Tempo and FireCAD software. Validation of these softwares done by compared the result with manual calculation using equation in text book. The final steps for this final project are the drawing of power plant site layout and financial analysis. From the electricity demand calculation approached by population growth, it is obtained that the electricity demand of Kotabaru is 45.51 MW by the year of 2018. Meanwhile, the result obtained with gross regional domestic income is 46.39 MW. According to calculation using pair-wise comparison method, the <br /> <br /> <br /> suitable kind of power plant for Kotabaru is Steam Power Plant. With the using of 5000 kcal/kg coal, the payback period for power plant investment is 13 years and 11 months, with 12.61% of IRR and Rp 122.490.000.000.000 of NPV. Meanwhile, with 6200 kcal/kg coal, the result for payback period is 16 years and a month, 10.52% of IRR and Rp 39.782.000.000.000 of NPV. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Power plant master plan is a document about comprehensive concept of power plant development planning. Its advantage is to coordinate the preparations for more detailed power plant development plan. In this final project, the power <br /> <br /> <br /> plant master plan is limited to capacity determination, choosing kind of power plant, power plant fundamentals design, and financial aspects. <br /> <br /> <br /> The final project estimates the electricity demand of Kotabaru, South Borneo Province, for the next ten years. The estimation is conducted with two approaches: population growth and gross domestic regional income. Afterwards, it <br /> <br /> <br /> is considered to choose the suitable kind of power plant with pair-wise comparison method. The next step is energy analysis using Cycle-Tempo and FireCAD software. Validation of these softwares done by compared the result with manual calculation using equation in text book. The final steps for this final project are the drawing of power plant site layout and financial analysis. From the electricity demand calculation approached by population growth, it is obtained that the electricity demand of Kotabaru is 45.51 MW by the year of 2018. Meanwhile, the result obtained with gross regional domestic income is 46.39 MW. According to calculation using pair-wise comparison method, the <br /> <br /> <br /> suitable kind of power plant for Kotabaru is Steam Power Plant. With the using of 5000 kcal/kg coal, the payback period for power plant investment is 13 years and 11 months, with 12.61% of IRR and Rp 122.490.000.000.000 of NPV. Meanwhile, with 6200 kcal/kg coal, the result for payback period is 16 years and a month, 10.52% of IRR and Rp 39.782.000.000.000 of NPV.
format Final Project
author (NIM : 13104004); Pembimbing Dr. Ir. Ari Darmawan Pasek, RIFANDI
spellingShingle (NIM : 13104004); Pembimbing Dr. Ir. Ari Darmawan Pasek, RIFANDI
POWER PLANT CAPACITY DETERMINATION AND FUNDAMENTALS DESIGN FOR KOTABARU REGION SOUTH BORNEO PROVINCE
author_facet (NIM : 13104004); Pembimbing Dr. Ir. Ari Darmawan Pasek, RIFANDI
author_sort (NIM : 13104004); Pembimbing Dr. Ir. Ari Darmawan Pasek, RIFANDI
title POWER PLANT CAPACITY DETERMINATION AND FUNDAMENTALS DESIGN FOR KOTABARU REGION SOUTH BORNEO PROVINCE
title_short POWER PLANT CAPACITY DETERMINATION AND FUNDAMENTALS DESIGN FOR KOTABARU REGION SOUTH BORNEO PROVINCE
title_full POWER PLANT CAPACITY DETERMINATION AND FUNDAMENTALS DESIGN FOR KOTABARU REGION SOUTH BORNEO PROVINCE
title_fullStr POWER PLANT CAPACITY DETERMINATION AND FUNDAMENTALS DESIGN FOR KOTABARU REGION SOUTH BORNEO PROVINCE
title_full_unstemmed POWER PLANT CAPACITY DETERMINATION AND FUNDAMENTALS DESIGN FOR KOTABARU REGION SOUTH BORNEO PROVINCE
title_sort power plant capacity determination and fundamentals design for kotabaru region south borneo province
url https://digilib.itb.ac.id/gdl/view/17004
_version_ 1820745509813354496