#TITLE_ALTERNATIVE#
Electricity demand in Indonesia increase about 6-9% every year, while fossil fuel resources used in many electric generation rapidly decrease. Therefore, an effort is needed to increase electric power and efficiency of electric generation. In this research, Priok Power Plant was chosen since it is a...
Saved in:
Main Author: | RONALD JEFFERSON PURBA (NIM : 13104044); Pembimbing : Dr. Ir. I Made Astina |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17081 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: MERLY PASTALOZI (NIM : 13104047); Pembimbing : Dr. Ir. I Made Astina, -
#TITLE_ALTERNATIVE#
by: RULAND SINEMBADAN (NIM : 13104122); Pembimbing : Dr.Ir. I Made Astina, YANANTA -
#TITLE_ALTERNATIVE#
by: TYMOTHEUS PURBA (NIM 12205057); Pembimbing: Dr. Ir. Doddy Abdassah, RICHARD -
#TITLE_ALTERNATIVE#
by: (NIM : 13706026); Pembimbing : Dr. Ir. Husaini Ardy, RONALD -
#TITLE_ALTERNATIVE#
by: MAJU PURBA (NIM: 23608010); Tim Pembimbing : Dr. Ir. Andi Isra Mahyuddin; Dr. Ir. Tatacipta, UNGKAP